Previous | Calendar |
June |
2024 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD147 |
27JD148Memorial Day |
28JD149SpB Out (sick) |
29JD150 |
30JD151 |
31JD152 |
1JD153 |
2JD154Site Visit (SpB, JvB, BsB): Details , Photos (19) Span cylinder at ?? psi, N2 at 700 psi at 14:30 MST, reconnected the MET logger to the data system open ground under all the lower AP200 inlets (ie, well snow-free) downloaded the AP200 data SpB Jeep warm; still plenty of snow on the trail (but melting fast) |
3JD155 |
4JD156 |
5JD157 |
6JD158Site Visit (SpB, HR): Details , Photos (31) Span cylinder at 1180 psi, N2 at 700 psi moved one new n2 cylinder from MRS snowshed to C-1 trailer: cc325748 (n2) from 12:53-13:09 MST swapped the 21.5m LI-7200 inlet at around 12:00 MST, swapped SD card from GPSCAM at 13:15 MST, turned on the fan in the LI-6262 box at 15:00 MST, added OTT Pluvio precip gauge to UCB logger (new program: ucb_31.csi) at 15:00 MST, started ops112 (added pluvio data to isffa) turned off the MRS logger (snowprobes, T from upper levels in one probe were way off all winter!) downloaded the A.Richardson and D.Bowling logger data Enterprise Jeep very warm; snow on the trail is 90% gone! |
7JD159Based on T.soil, snow is now gone at the mini-tower (start of the warm season) |
8JD160 |
9JD161 |
10JD162from 9:00-10:00 MST, lost contact with isffa (radio modem at tower issue?) |
11JD163 |
12JD164 |
13JD165 |
14JD166Flag Day |
15JD167 |
16JD168Fathers Day |
17JD169 |
18JD170 |
19JD171Rain in the PM (check pluvio) |
20JD172 |
21JD173Summer Solstice |
22JD174 |
23JD175 |
24JD176Hot |
25JD177Site Visit (SpB, HR): Details , Photos (23) Span cylinder at 1180 psi, N2 at 700 psi at 11:15 MST, turned the fan for the CNR4 sensor back on from 11:20-11:30 MST, cleaned krypton hygrometer at 14:00 MST, added 2nd OTT Pluvio precip gauge to UCB logger (new program: ucb_32.csi) at 14:00 MST, started ops113 (added pluvio2 data to isffa) Enterprise Jeep hot; snow long-gone, very crispy! |
26JD178 |
27JD179In Lab/Cristol (SpB, HR): Details , Photos (12) refreshed data backups, see: usb_disk_western_digital_my_passport_5Tb.txt setup branch on the microlysimeter load cell at 11:00 MST, sprayed water on the branch |
28JD180 |
29JD181 |
30JD182 |
1JD183NOTE: Starting on 7/1/24, start paying for urquell sys admin requests (crafty penguins) |
2JD184Site Visit (SpB, HR): Details , Photos (29) Span cylinder at 1000 psi, N2 at 300 --> 1920 psi swapped N2; now using cc236580 (at 300 psi) with AP200; started cc301531 at 1920 psi from 10:00-10:15 MST, removed screens from OTT Pluvio sensors (tested them w/o screens and now they seem ok) NOTE: do not use pluvio1/pluvio2 data since Tue 6/25/24! from 11:30-12:00 MST, added span (ru000402, from LBL) and n2 gas cylinders (cc236580) to the ap200 system from 12:30-13:00 MST, moved ap200 temp sensor #8 from ap200 level to 21.5m SpB Prius cool and breezy; some rain in early morning |
3JD185 |
4JD186Independence Day |
5JD187 |
6JD188 |