Previous

Calendar

June

2024

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD147

27

JD148
Memorial Day

28

JD149
SpB Out (sick)

29

JD150

30

JD151

31

JD152

1

JD153

2

JD154
Site Visit (SpB, JvB, BsB): Details , Photos (19)

Span cylinder at ?? psi, N2 at 700 psi

at 14:30 MST, reconnected the MET logger to the data system

open ground under all the lower AP200 inlets (ie, well snow-free)

downloaded the AP200 data

SpB Jeep

warm; still plenty of snow on the trail (but melting fast)

3

JD155

4

JD156

5

JD157

6

JD158
Site Visit (SpB, HR): Details , Photos (31)

Span cylinder at 1180 psi, N2 at 700 psi

moved one new n2 cylinder from MRS snowshed to C-1 trailer: cc325748 (n2)

from 12:53-13:09 MST swapped the 21.5m LI-7200 inlet

at around 12:00 MST, swapped SD card from GPSCAM

at 13:15 MST, turned on the fan in the LI-6262 box

at 15:00 MST, added OTT Pluvio precip gauge to UCB logger (new program: ucb_31.csi)

at 15:00 MST, started ops112 (added pluvio data to isffa)

turned off the MRS logger (snowprobes, T from upper levels in one probe were way off all winter!)

downloaded the A.Richardson and D.Bowling logger data

Enterprise Jeep

very warm; snow on the trail is 90% gone!

7

JD159
Based on T.soil, snow is now gone at the mini-tower (start of the warm season)

8

JD160

9

JD161

10

JD162
from 9:00-10:00 MST, lost contact with isffa (radio modem at tower issue?)

11

JD163

12

JD164

13

JD165

14

JD166
Flag Day

15

JD167

16

JD168
Fathers Day

17

JD169

18

JD170

19

JD171
Rain in the PM (check pluvio)

20

JD172

21

JD173
Summer Solstice

22

JD174

23

JD175

24

JD176
Hot

25

JD177
Site Visit (SpB, HR): Details , Photos (23)

Span cylinder at 1180 psi, N2 at 700 psi

at 11:15 MST, turned the fan for the CNR4 sensor back on

from 11:20-11:30 MST, cleaned krypton hygrometer

at 14:00 MST, added 2nd OTT Pluvio precip gauge to UCB logger (new program: ucb_32.csi)

at 14:00 MST, started ops113 (added pluvio2 data to isffa)

Enterprise Jeep

hot; snow long-gone, very crispy!

26

JD178

27

JD179
In Lab/Cristol (SpB, HR): Details , Photos (12)

refreshed data backups, see: usb_disk_western_digital_my_passport_5Tb.txt

setup branch on the microlysimeter load cell

at 11:00 MST, sprayed water on the branch

28

JD180

29

JD181

30

JD182

1

JD183
NOTE: Starting on 7/1/24, start paying for urquell sys admin requests (crafty penguins)

2

JD184
Site Visit (SpB, HR): Details , Photos (29)

Span cylinder at 1000 psi, N2 at 300 --> 1920 psi

swapped N2; now using cc236580 (at 300 psi) with AP200; started cc301531 at 1920 psi

from 10:00-10:15 MST, removed screens from OTT Pluvio sensors (tested them w/o screens and now they seem ok)

NOTE: do not use pluvio1/pluvio2 data since Tue 6/25/24!

from 11:30-12:00 MST, added span (ru000402, from LBL) and n2 gas cylinders (cc236580) to the ap200 system

from 12:30-13:00 MST, moved ap200 temp sensor #8 from ap200 level to 21.5m

SpB Prius

cool and breezy; some rain in early morning

3

JD185

4

JD186
Independence Day

5

JD187

6

JD188