Previous | Calendar |
May |
2024 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
28JD119 |
29JD120 |
30JD121 |
1JD122 |
2JD123In Lab/Cristol (SpB): Details , Photos (6) did data backups, see: usb_disk_western_digital_my_passport_5Tb.txt at 12:00 MST, put 200 g of weight in the beaker (no water in it) at 14:43 MST, added another 200 g to the beaker |
3JD124Site Visit (SpB, SF): Details , Photos (28) Span cylinder at 1300 psi, N2 at 900 psi moved cc301531 (n2) from C-1 trailer to outside tga shed between 10:24-10:27 MST, removed snow from around the 0.5m AP200 inlet downloaded AP200 data at 12:38 MST, swapped the 2.5m LI-7500A usb thumb drive Enterprise rental (malibu) clear skies; warm |
4JD125 |
5JD126 |
6JD127at 16:12 MST, lost power at the site very windy/cold/snow |
7JD128at around 10 MST, power at the site back on at 11:10 MST, power went back off at around 14:00 MST, power at the site back on (and stayed on) the CNR4 radiation sensor was sending NaNs after the power outage windy/cold/snow |
8JD129 |
9JD130In Lab/Cristol (SpB, HR): Details , Photos (2) refreshed data backups, see: usb_disk_western_digital_my_passport_5Tb.txt unboxed the pluvio2 precip gauge |
10JD131 |
11JD132 |
12JD133Mothers Day |
13JD134 |
14JD135In Lab/Cristol (SpB, HR): Details tested USB thumb drive, see: make_usb_disk_fat32_for_licor.txt |
15JD136 |
16JD137In Lab/Cristol (SpB, HR): Details , Photos (5) at around 10:30 MST, connected pluvio precip gauge to the lab dsm at 13:03 MST, added 200 ml of water back to the flask, put in bucket at around 14:15 MST, added 134.5 g of water to the pluvio precip gauge at around 14:21 MST, added 1.5 liters of water to the pluvio precip gauge at around 10:00 MST, started ops111 (added pluvio output to lab dsm) |
17JD138noticed some network connection issues to the tower (to radio modem at C-1 is ok). Approx 50% packets lost on ping. |
18JD139 |
19JD140 |
20JD141 |
21JD142In Lab/Cristol (SpB, HR): Details , Photos (6) at around 7:55 MST, added 1.5 liters of water to the pluvio precip gauge |
22JD143 |
23JD144Site Visit (SpB, HR): Details , Photos (23) Span cylinder at 1200 psi, N2 at 790 psi CNR4 now working again (unclear what the issue was; battery power seems ok), left fan disconnected the 0.5m AP200 inlet is snow-free downloaded AP200 data at 12:40 MST, swapped the 2.5m LI-7500A usb thumb drive (now back to original drive) NOAA Steve made the drive to C-1 (first of the year) after return to Boulder: realized that the MET logger is not outputting data into the data system! Enterprise rental gusty at times; still lots of snow |
24JD145SpB Off |
25JD146 |
26JD147 |
27JD148Memorial Day |
28JD149SpB Out (sick) |
29JD150 |
30JD151 |
31JD152 |
1JD153 |