Previous

Calendar

August

2021

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD213

2

JD214
Site Visit (TV, RA, SH + students): Details

started setup of permanent tree plots

SpB off

3

JD215
Site Visit (TV, RA, SH + students): Details

continued setup of permanent tree plots

4

JD216

5

JD217

6

JD218

7

JD219
Very smokey (along the front range) due to CA fires

during the day, LI-6262 flow rate dropped from 7 lpm to 6 lpm

8

JD220

9

JD221

10

JD222

11

JD223
at 23:00 MST, auto-reboot of urquell

12

JD224

13

JD225
SpB Returns (in evening)

14

JD226
Site Visit (SpB): Details , Photos (26)

Span cylinder at 1300 psi, N2 at 1650 psi

from 10:45-11:46 MST, replaced 2-micron Nupro filters in LI-6262 system (both at inlet and in the box)

from 12:15-12:45 MST, swapped the 21.5m LI-7200 inlet assembly

SpB Prius

Partly cloudy; brief rain in PM

15

JD227

16

JD228
In Lab/Cristol (SpB): Details

Cleaned 4 Nupro filters for LI-6262 system

Cleaned 2 Nupro filters for LI-7200 inlets

17

JD229

18

JD230

19

JD231
at around 14:00 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage)

at 8:30 MST, noticed that the LI-7200 clock is 10 sec slow

20

JD232
Site Visit (SpB, SK, A): Details , Photos (38)

Span cylinder at 1000 psi, N2 at 1450 psi

moved span cylinder fb03909 from C-1 to the shed at tower

found 15 more nwB cored-tree sites (all except B61 are found)

found 8 more nwC cored-tree sites (still need to record the 5x and 6x ones)

at around 12:00 MST, reset the 21.5m LI-7200 clock

SpB Prius

Quite windy in AM; cool

21

JD233

22

JD234

23

JD235
Site Visit (SpB, TM, Z): Details , Photos (39)

Span cylinder at 900 psi, N2 at 1420 psi

TM/Z removed photospec (and related stuff in shed)

found 10 more nwC cored-tree sites

at around 10:45 MST, replaced (broken) domes in 2-m REBS Rnet sensor

at around 10:55 MST, swiped lens of the 2m LI-7500A and LI-7500

Enterprise rental

Sun/clouds mix; pleasant

24

JD236
Site Visit (TM, Z): Details

TM/Z final cleanup of photospec

25

JD237

26

JD238

27

JD239

28

JD240

29

JD241
Site Visit (PB, N, HR): Details

tour of site for Natasha

in early morning (at around 1:15 MST), 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage)

30

JD242

31

JD243

1

JD244
at around 4:10 and again at 10:45 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage)


2

JD245

3

JD246

4

JD247