Previous | Calendar |
August |
2021 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD213 |
2JD214Site Visit (TV, RA, SH + students): Details started setup of permanent tree plots SpB off |
3JD215Site Visit (TV, RA, SH + students): Details continued setup of permanent tree plots |
4JD216 |
5JD217 |
6JD218 |
7JD219Very smokey (along the front range) due to CA fires during the day, LI-6262 flow rate dropped from 7 lpm to 6 lpm |
8JD220 |
9JD221 |
10JD222 |
11JD223at 23:00 MST, auto-reboot of urquell |
12JD224 |
13JD225SpB Returns (in evening) |
14JD226Site Visit (SpB): Details , Photos (26) Span cylinder at 1300 psi, N2 at 1650 psi from 10:45-11:46 MST, replaced 2-micron Nupro filters in LI-6262 system (both at inlet and in the box) from 12:15-12:45 MST, swapped the 21.5m LI-7200 inlet assembly SpB Prius Partly cloudy; brief rain in PM |
15JD227 |
16JD228In Lab/Cristol (SpB): Details Cleaned 4 Nupro filters for LI-6262 system Cleaned 2 Nupro filters for LI-7200 inlets |
17JD229 |
18JD230 |
19JD231at around 14:00 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) at 8:30 MST, noticed that the LI-7200 clock is 10 sec slow |
20JD232Site Visit (SpB, SK, A): Details , Photos (38) Span cylinder at 1000 psi, N2 at 1450 psi moved span cylinder fb03909 from C-1 to the shed at tower found 15 more nwB cored-tree sites (all except B61 are found) found 8 more nwC cored-tree sites (still need to record the 5x and 6x ones) at around 12:00 MST, reset the 21.5m LI-7200 clock SpB Prius Quite windy in AM; cool |
21JD233 |
22JD234 |
23JD235Site Visit (SpB, TM, Z): Details , Photos (39) Span cylinder at 900 psi, N2 at 1420 psi TM/Z removed photospec (and related stuff in shed) found 10 more nwC cored-tree sites at around 10:45 MST, replaced (broken) domes in 2-m REBS Rnet sensor at around 10:55 MST, swiped lens of the 2m LI-7500A and LI-7500 Enterprise rental Sun/clouds mix; pleasant |
24JD236Site Visit (TM, Z): Details TM/Z final cleanup of photospec |
25JD237 |
26JD238 |
27JD239 |
28JD240 |
29JD241Site Visit (PB, N, HR): Details tour of site for Natasha in early morning (at around 1:15 MST), 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) |
30JD242 |
31JD243 |
1JD244at around 4:10 and again at 10:45 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) |
2JD245 |
3JD246 |
4JD247 |