29JD241Site Visit (PB, N, HR): Details tour of site for Natasha in early morning (at around 1:15 MST), 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) |
30JD242 |
31JD243 |
1JD244at around 4:10 and again at 10:45 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) |
2JD245 |
3JD246 |
4JD247 |
|||||||||||||||||||||
5JD248 |
6JD249CU Holiday (Labor Day) |
7JD250 |
8JD251Xcel Energy planned power outage from 11pm-1am MDT at 22:00 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (due to Xcell power outage) |
9JD252at around 3:00 MST, 21.5m LI-7500A (op2) and LI-7200 back on (power outage was around 5 hours) in AM, radio modem at tower down (due to power outage). At around 7 MST, was able to reboot it. |
10JD253Site Visit (SpB): Details , Photos (36) Span cylinder at 250 psi, N2 at 1150 psi from 11:30-11:58 MST, swapped the 21.5m LI-7200 inlet assembly Downloaded data from EOS FD sensors #3 and #4 at approx 9:45 MST, removed EOS FD sensors #3 and #4 swapped radCAM SD card (note, month was off!, was set to Aug, changed to Sep) SpB Jeep Sunny, HOT!, a few high clouds |
11JD254
|
12JD255
|
13JD256
|
14JD257
|
15JD258
|
16JD259Site Visit (SpB): Details , Photos (20) Span cylinder at 50 --> 1950 psi, N2 at 1020 psi at 10:50 MST, swapped span cylinder; old=fb03874 new=cc235665 Confirmed 3 (empty) gas cylinders to be picked up in snowshed 21.5m LI-7200 fan is at max, but flow still ok at 12:00 MST, turned off the fan in the LI-6262 box Downloaded tree sway data (Mark R) Tried NiwotSapflux_V5.3.CR1 in Dave B's CR1000 the REBS sensor was tilted downward; at approx 14:00 MST, fixed (added hose clamp) CU Class Tour (N. Lovenduski) SpB Prius Pleasant. Mostly clear skies.
|
17JD260
|
18JD261
|
19JD262
|
20JD263AmeriFlux Annual Meeting (virtual), start
|
21JD264
|
22JD265AmeriFlux Annual Meeting (virtual), end Fall Equinox
|
23JD266
|
24JD267
|
25JD268
|
26JD269
|
27JD270
|
28JD271Site Visit (SpB, TV, RC, AM): Details , Photos (24) Span cylinder at 1790 psi, N2 at 800 psi at around 1:45 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (due to power outage) from 9:24-9:46 MST, replaced LI-7200 fan tygon tubing Downloaded tree sway data Rachel and Tom recorded dendroband readings. Uploaded revised NiwotSapflux_V5.3.CR1 to Dave B's CR1000 (left it running on the logger) SpB Prius Calm, clear in AM
|
29JD272
|
30JD273in AM: foggy, overcast
|
1JD274
|
2JD275 |