Previous

Calendar

October

2016

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

25

JD269

26

JD270

27

JD271

28

JD272

29

JD273
Site Visit (SpB, AR, R): Details , Photos (32)

Span cylinder at 1150 psi. N2 at 350 psi

from 11:30-13:00 MST, replaced CSAT3 sn 0198 (ver4) with CSAT3 sn 0328 (ver5)

AR restored the FLIR camera

SpB Jeep

Some clouds, no rain, light winds

30

JD274

1

JD275

2

JD276

3

JD277

4

JD278

5

JD279
NWT/LTER Meeting (11-2pm, S228 SEEC)

6

JD280
First significant snowfall of the season.

7

JD281

8

JD282

9

JD283

10

JD284
Site Visit (SpB): Details , Photos (28)

Span cylinder at 1050 psi. N2 at 150 --> 1600 psi

from 12:15-12:30 MST, removed cc319297 (N2) at 150 psi started cc448922 at 1600 psi

powered up NOAH and MRS loggers

SpB Jeep

Cloudy, gusty at times

INSTAAR All Hands Meeting (noon, @SEEC Auditorium)

Columbus Day

11

JD285

12

JD286
SpB Off

13

JD287

14

JD288

15

JD289

16

JD290
SpB Returns

17

JD291

18

JD292

19

JD293

20

JD294
In late afternoon, short power outage? at site, connection back up in evening

21

JD295
Site Visit (SpB): Details , Photos (24+)

Span cylinder at 1000 psi. N2 at 1400 psi

Added the LI-7200 Heated Inlet (set to 3.5 W)

at 15:00 MST, removed KZ PAR-LITE sensor (PAR2.up) from top tower level

Avis SUV (my bike stolen!)

Clear, gusty at times, calm in PM

22

JD296

23

JD297

24

JD298

25

JD299

26

JD300

27

JD301

28

JD302
Setup the spare titan in lab (didn't work, bad cable!): photo1

29

JD303

30

JD304

31

JD305
Halloween

1

JD306

2

JD307
noticed that NCTC thermocouple "T3" isn't working

In morning: light/dusting of snow

3

JD308

4

JD309

5

JD310