Previous

Calendar

September

2016

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

28

JD241

29

JD242

30

JD243

31

JD244

1

JD245

2

JD246
Site Visit (SpB): Details , Photos (24)

Span cylinder at 1300 psi. N2 at 100 --> 800 psi

from 9:00-10;00 MST, removed gg22047 (N2) started cc319297 at 800 psi

from 9:15-9:30 MST, added PAR-LITE sensor (PAR2.up) to top tower level

removed prof system innards (brought back to lab)

removed computer from TGA shed (mailed to AR)

MRS Shuttle

Windy/Rainy in AM, then mostly overcast

3

JD247

4

JD248

5

JD249
CU Holiday (Labor Day)

6

JD250

7

JD251

8

JD252

9

JD253

10

JD254

11

JD255

12

JD256

13

JD257

14

JD258

15

JD259

16

JD260

17

JD261

18

JD262

19

JD263

20

JD264

21

JD265
Site Visit (SpB, PB, MG, BR, +): Details , Photos (46)

Span cylinder at 1200 psi. N2 at 400 psi

AmeriFlux Tech-Data Workshop at MRS (in AM: tour of Niwot Tower)

in AM: Maria and Brett from Utah removed the TGA

Deb Agarwal Photos (43)

You-Wei Cheah Photos (18)

SpB Jeep

Cool and overcast

Fall Equinox

22

JD266
AmeriFlux PI Meeting (Golden, CO)

23

JD267
End of AmeriFlux PI Meeting

24

JD268

25

JD269

26

JD270

27

JD271

28

JD272

29

JD273
Site Visit (SpB, AR, R): Details , Photos (32)

Span cylinder at 1150 psi. N2 at 350 psi

from 11:30-13:00 MST, replaced CSAT3 sn 0198 (ver4) with CSAT3 sn 0328 (ver5)

AR restored the FLIR camera

SpB Jeep

Some clouds, no rain, light winds

30

JD274

1

JD275