Previous | Calendar |
November |
2016 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD304 |
31JD305Halloween |
1JD306 |
2JD307noticed that NCTC thermocouple "T3" isn't working In morning: light/dusting of snow |
3JD308 |
4JD309 |
5JD310 |
6JD311in early AM: Daylight savings time (MDT) ends, change to MST. |
7JD312 |
8JD313 |
9JD314at 22:00 MST, urquell rebooted/kernel update (didn't come back up) |
10JD315Site Visit (SpB, GM): Details , Photos (6) Span cylinder at 850 psi. N2 at 1050 psi at approx 11:30 MST, urquell back up from 13:00-14:00 MST, swapped the titan DSM (iffa) with a spare titan DSM (w/ updated OS and software) at 15:00 MST, reconnected NCTC thermocouple "T3" (seemed ok when left) at 17:03 MST, urquell lost contact with the isffa/titan dsm (suspect firewall issues)! SpB Jeep Fairly calm, clouded up in PM |
11JD316Site Visit (SpB): Details , Photos (1) from 16:00-17:00 , a quick trip to confirm that the titan DSM (iffa) was collecting data (it was) nework to isffa still down (network card hardware issue) SpB Jeep Calm, warm |
12JD317 |
13JD318 |
14JD319Site Visit (SpB, GM): Details , Photos (8) Span cylinder at 810 psi. N2 at 1000 psi from 13:00-14:00 MST, reconnected the titan DSM (iffa) to the network, modified a few settings in the software NCTC thermocouple "T3" not working again (appears to be an intermittent problem) early on 11/15, started ops87: Gordon added Stratum (NTP stratum) Timeoffset (Clock offset, usec), and Tcpu (degC) as new titan output variables GSA Windy, clear skies |
15JD320 |
16JD321NWT/LTER Meeting (11:15-12:30pm, TBD) |
17JD322Meeting at NCAR w/ BM, JF, NP, DL, and JF for pressure stuff (11-12:30pm) In PM: snow |
18JD323 |
19JD324 |
20JD325 |
21JD326 |
22JD327 |
23JD328 |
24JD329CU Holiday (Thanksgiving) in PM: connection to tower working, but degraded |
25JD330CU Holiday (Day after Thanksgiving) connection to tower working, but degraded |
26JD331connection to tower working, but degraded |
27JD332 |
28JD333at 14:00: connection to MRS/tower fixed (microwave communication hardware replacement) |
29JD334 |
30JD335noticed on cockpit that the 8m aspirated temp sensor (T2.8m) might be having issues? (RH2.8m looks ok) |
1JD336Site Visit (SpB): Details , Photos (27) Span cylinder at 650 psi. N2 at 650 psi moved cc488576 to tower, moved gg22047 to trailer from 13:20-14:40 MST, replaced vanes in GAST pump from 14:35-14:40 MST, adjusted span/zero flow in LI-6262 SpB Jeep Light winds, near freezing |
2JD337 |
3JD338 |