Previous | Calendar |
July |
2014 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
29JD180Site Visit (SpB): Details , Photos (35) Span cylinder at 1800 psi, N2 at 1320 psi from 8:05-9:30 MST, cleaned the LI-7200 windows and cell; again lowered LI-7200 inlet assembly heater power from 0.29 A at 26V to 0.19 A at 17 V (seems to be unstable?) LI-7200 sig strengths looking good screenshot at 7:20 MST, swapped thumb drive in titan2, now running fastpb17.csi (no time updates) SpB Jeep Warm and sunny. |
30JD181 |
1JD182Site Visit (DB, M): Details N2 at 1300 psi (fittings checked) service TGA, remove electronic dendrometers |
2JD183at 9:30 am, meet with DB/PB connected LI7500A (OP-1) to cr23x/dreamplug (uc_04b.csi) in Cristol |
3JD184Site Visit (ES): Details ES redeploys EC155 |
4JD185CU Holiday (Independence Day) |
5JD186 |
6JD187 |
7JD188 |
8JD189Hazy/Foggy in AM. short power outage? RH4 stops working (again) |
9JD190Site Visit (SpB, PB, D, LSD, T, J): Details , Photos (31) Span cylinder at 1790 psi, N2 at 1200 psi moved cc197414 (n2) to tower at 11:30 MST, lowered LI-7200 inlet assembly heater power to 0.13 A at 10.4V (it was at 0.24 A, 21.4V??) setup LI-7500A (OP1?) in the trailer from 12:44-12:57 MST, changed profiler (li-6251) dessicant (also re-zeroed LI-6251) from 13:00-13:03 MST, re-zeroed LI-6262 (co2 and h2o) covered part of fiber optic cable (along creek) with pipe foam modified fastpb17.csi (w/ time updates) to reset sec to 0.00 CU Jeep Cherokee Big clouds. Warm. |
10JD191 |
11JD192 |
12JD193 |
13JD194 |
14JD195 |
15JD196 |
16JD197 |
17JD198Site Visit (ES): Details ES upgrades OS in EC100 module |
18JD199 |
19JD200 |
20JD201 |
21JD202 |
22JD203made adjustments to the LI-7500A output: photo1, photo2 |
23JD204 |
24JD205Site Visit (SpB, PB, DM, +): Details , Photos (17) Span cylinder at 1700 psi, N2 at 850 psi Flux class visted the tower (in afternoon). ES swaps out scrub module SpB Jeep Breezy, no rain. |
25JD206 |
26JD207 |
27JD208Site Visit (SpB, KK): Details , Photos (17) Span cylinder at 1650 psi, N2 at 750 psi moved cc316422 (n2) to tower at 11:40 MST, increased LI-7200 inlet assembly heater power from 0.15 A at 12.5V to 0.19 A at 16.3 V from 12:11-12:25 MST, replaced 2 micron Nupro filter in LI-6262 box removed two broken T.ir.snow sensors (from NCTC logger) covered part of fiber optic cable with split loom and also some foam at mid-day, added KZ PAR-LITE sensor as PAR2.up to CNR logger started fastpb18.csi (w/ time updates) to reset sec to 0.01 CU Jeep Cherokee Sunny in morning, then humid + some sun breaks. |
28JD209 |
29JD210Heavy rain (afternoon and overnight) |
30JD211Heavy rain in morning, LI-7200 might have ingested water? fast CR23X is only working intermittently? |
31JD212Site Visit (ES): Details sometime overnight on 7/30, the LI-7200 sample flow goes to zero in late afternoon: ES upgrades firmware in EC100 module |
1JD213 |
2JD214Site Visit (SpB): Details , Photos (26) Span cylinder at 1600 psi, N2 at 620 psi in morning: replaced LI-7200 pump module (mounted vertically). Heater at 0.18 A at 16.1 V at 15:40 MST, swiped krypton the LI-6251 dessicant tube was plugged, co2 was off-scale (it was ok on 7/31 and/or 8/1?). from approx 16:05-16:15 MST, Changed profiler (li-6251) dessicant added GPS signal input to titan2/isffa (/dev/ttyS4). CU Prius Sunny and warm day. |