1JD153 |
2JD154 |
3JD155 (rain on and off, cool)Site Visit (JB, NT): Details , Photos (6) downloaded from cnr, prof, met, nctc, ucb, uc, soil, tcs, and swapped pc cards at the mrs logger turned on fans in both licor boxes and the quacker box checked prof flow rate, looked good see details for snow depths span @ 850 psi, N2 @ 1625 psi snapped phenology photos brought 2 new co2-in-air cylinders to the trailer from Ramaley (CC282352, CC282376) |
4JD156 (rain on and off, cool)Site Visit (JB): Details span @ 840 psi, N2 @ 1525 psi brought 2 empty N2 cylinders back to Ramaley from the trailer performed some maintenance on the robot, started summer weekly sampling (see details) post-calibrated airgas cylinder CC18996, calibrated airgas cylinders CC282352, CC282376 (see details) |
5JD157Spring Snowstorm |
6JD158 |
7JD159 |
8JD160 |
9JD161get gray jeep back for rest of summer Dave Bowling (Utah) at the site this week. |
10JD162 |
11JD163 |
12JD164 (cool, windy)Site Visit (SpB, JB, DB, NT, MP, CB, SH, SL): Details , Photos (19) span @ 750 psi, N2 @ 1290 psi robot, done=2 at ~10 MST, turned on the "slow" ozone system. moved the forestcam power directly to the back of the UPS |
13JD165JB Off |
14JD166 |
15JD167 |
16JD168Suburban rental starts (Jeep to Alamosa). |
17JD169for some (unknown) reason the flow rate in the EC/LI-6262 system dropped slightly for a short time in the morning (seems like a wiring or logger problem since T.ec also dropped at the same time!). |
18JD170Site Visit (SpB, JB, SL, SH): Details , Photos (22) span @ 725, N2 @ 1100 psi grabbed ucb, uc, soil, noah, tc and mrs data replaced the dessicant vials in the 2.5m LI-7500 (sn 75H-0082) moved the 2.5m PAR sensors so TRAM can use the mini-tower brought down empty co2 cylinder (CC18996). robot, done=1 JB returns |
19JD171 (warm)Site Visit (SpB, JB): Details , Photos (19) replaced the dessicant vials in the 2.5m LI-7500 (sn 75H-0082) moved the 2.5m REBS sensor and configured both PAR and REBs sensors in "tree mount" at ~11 MST, cleaned krypton hygromter hauled Maggie's ladder to the shed replaced all prof inlet filters swapped desiccant at the LI-6251, blow test and zero good |
20JD172JB Off |
21JD173Summer solstice (longest day of the year) |
22JD174 |
23JD175SpB Off |
24JD176JB returns |
25JD177Site Visit (JB, SO): Details afternoon thunder and lightning tram work |
26JD178Site Visit (JB, SO, MP, NT, CB, SL, SH): Details more tram work for JB and SO swapped 15 flasks at the west robot MP & Co. started testing the ladder method for wand deployment |
27JD179Site Visit (JB, SO, SO): Details more tram setup |
28JD180 |
29JD181 |
30JD182 |
1JD183 |
2JD184SpB Returns |
3JD185Site Visit (SpB, JB, JH, NT, SH, SL): Details , Photos (32) span @ 610 psi, N2 @ 675 psi from 10:15-10:45 MST, changed domes on 26m REBS Rnet sensor downloaded from cnr, prof, nctc, met, soil, tcs, ucb and uc loggers changed internal chemicals in the LI-7500 (sn 75H-0084) on the main tower swapped 15 flasks at the robot at ~10 MST, increased flow rate in prof system from "9" to "14" at ~13:00 MST, prof pump (UN828 KNI) at the base of the main tower was dead, we replaced it with a new pump Cloudy down on the plains; sunny at the tower |
4JD186CU Holiday (Independence Day) |
5JD187 |