Previous | Calendar |
July |
2008 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
29JD181 |
30JD182 |
1JD183 |
2JD184SpB Returns |
3JD185Site Visit (JB, SpB, SH, NT, JH, SL): Details , Photos (34) span @ 610 psi, N2 @ 675 psi from 10:15-10:45 MST, changed domes on 26m REBS Rnet sensor downloaded from cnr, prof, nctc, met, soil, tcs, ucb and uc loggers changed internal chemicals in the LI-7500 (sn 75H-0084) on the main tower swapped 15 flasks at the robot at ~10 MST, increased flow rate in prof system from "9" to "14" at ~13:00 MST, prof pump (UN828 KNI) at the base of the main tower was dead, we replaced it with a new pump Cloudy down on the plains; sunny at the tower |
4JD186CU Holiday (Independence Day) |
5JD187 |
6JD188Site Visit (SO, LL): Details 2.5m csat was moved (by accident). Returned to approx. original position. |
7JD189 |
8JD190Site Visit (JB, SH, NT, CB, SL): Details prof "flow-meter" ball was at ~13, increased the flow to 15 between 13-14 MST, chan 204 (met logger) was dropping data points (seems ok now) HEAVY hail/rain storm 12:15-12:45 MDT |
9JD191 |
10JD192 |
11JD193Site Visit (SpB, SO, LL, M, RM, SH, SL): Details , Photos (11) at ~11:00 MST, added KZ PAR-LITE sensor as PAR2.up to CNR logger started install of MATLAB on computers for the flux class. |
12JD194 |
13JD195Site Visit (SpB, RM, DM, etc): Details Met with campbell folks; finished MATLAB install at MRS. |
14JD196Site Visit (JB, SpB, SO, LL, Mike): Details , Photos (18) swapped 15 flasks at the west robot brought the N2 cylinder (CC193097) from Como Creek out to the flux tower, and brought a new span cylinder (CC282376) from the trailer to the tower downloaded from the soil and tcs loggers from 10:30-11:15 MST, replaced the ec gast pump at 11:30 MST, cleaned the krypton optics at 11:45 MST, connected power to fan for 2.5m REBs Rnet sensor helped SO at tram in the afternoon Start of "Flux" class at MRS. |
15JD197Site Visit (SpB, MP/SH/CB, NT/SL, JM): Details |
16JD198Site Visit (SpB, RM, MP/SH/CB, NT/SL, etc): Details , Photos (7) from 9-noon MDT, Campbell Sci instrumentation demonstration for Flux class (at trailer). from 11:00-11:30 MST, Replaced N2 at tower (New cylinder= CC193097 at 1900 psi, Old cylinder= CC262308, at 150 psi) |
17JD199Site Visit (SpB, RM, DB, JH, MP/SH/CB, NT/SL, etc): Details , Photos (6) from 9-noon MDT, Tower visit by the Flux class. JB Off Cool and Overcast--a brief rain shower in the afternoon |
18JD200Site Visit (SpB, RM, DB, SO, LL): Details , Photos (7) from 11:32-11:48 MST, Changed profiler (li-6251) dessicant lowered flow rates of N2/Span gas for LI-6262 (sample flow rate is a bit low) tram work (afternoon) better ventilation system added to bowling shed (DB) |
19JD201 |
20JD202 |
21JD203Site Visit (SpB, MP/SH/CB/RaM, NT/SL): Details , Photos (11) from 11:38-12:08 MST, replace 2-micron Nupro filters in EC/LI-6262 system. re-adjusted flow rates of N2/Span gas for LI-6262 (since sample flow rate is now higher) swapped 15 flasks at the west robot Clear skies (and HOT) in morning--clouded up and cooled off in the afternoon |
22JD204Short (1-second?) Power outage at 12:53:51 MDT |
23JD205Site Visit (SpB, MP/JH/CB, NT/SL): Details , Photos (5) worked on PAR setup (swapped card in grove 1, and then moved ladder to grove 2) Overcast in morning--a brief (fairly hard) rain shower in the afternoon |
24JD206 |
25JD207End of the "Flux" class at MRS. JB returns to work |
26JD208 |
27JD209 |
28JD210Site Visit (SpB/JB, MP/SH/BH/NM, NT/SL): Details , Photos (11) worked on PAR setup (worked on two trees in grove 2) swapped 15 flasks at the west robot Cool and overcast in morning--some rain and a bit of lightning/thunder in afternoon |
29JD211 |
30JD212High Ozone alerts issued for Denver-metro and Front Range region |
31JD213 |
1JD214Clear skies (and HOT) all day today JB with Merced |
2JD215 |