Previous | Calendar |
May |
2008 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
27JD118 |
28JD119Site Visit (JH): Details Collected soil samples---soil starting to thaw out. |
29JD120 |
30JD121 |
1JD122SUMMER JEEP RENTAL STARTS TODAY (start with green Jeep; gray Jeep is getting glass repaired) |
2JD123CU classes end green Jeep traded in for gray Jeep |
3JD124gray Jeep leaves for Alamosa |
4JD125 (warm/pleasant)Site Visit (SpB): Details , Photos (32) at 10:50 MST, the support cable for the 25m REBs Q*7 sensor was loose; reconnected it (this might slightly affect the angle of this sensor). from 11:30-12:30 MST, replaced 2-micron Nupro filter at LI-6262 inlet, also replaced nalgene at inlet downloaded data from all loggers except UC and UCB |
5JD126 |
6JD127 |
7JD128 |
8JD129Ice/snow/rain, in-canopy csats appear to be iced up |
9JD130Site Visit (JH): Details Collected soil samples. gray Jeep returns late from Alamosa, gets traded in for green Jeep (so gray Jeep's windows can get repaired) note: road from MRS to C1 is now passable |
10JD131 |
11JD132 |
12JD133 |
13JD134 |
14JD135 |
15JD136 (not too cold, heavy snow on and off)Site Visit (SpB, JB): Details , Photos (28) note: road from MRS to C1 was open, but snowy fixed T3 on the tower grabbed snow depths (see details) started massive trailer cleaning see details for cylinder removal/cal info |
16JD137 |
17JD138 |
18JD139 |
19JD140 (warm)Site Visit (JB, SO): Details work on TRAM setup |
20JD141 (warm)Site Visit (JB, SO): Details , Photos (5) more work on TRAM setup see details for snow depths cleaned krypton optics downloaded from soil, tcs, mrs logger and Noah's logger N2 @ 350 psi, span @ 1000 psi |
21JD142Site Visit (SpB, JB, SO, JH, NT, CB): Details , Photos (13) more work on TRAM setup |
22JD143Site Visit (JB, SO): Details N2 at tower replaced (see details) more work on TRAM setup |
23JD144Site Visit (JB, SO, NT): Details at 10:15 MST, Tower data system down (russter2 monitor not working) at 14:55 MST, Tower data system back up the monitor appears to be ok now. more work on TRAM setup see details for snow depths |
24JD145 |
25JD146 |
26JD147CU Holiday (Memorial Day) wet/overcast/rain. |
27JD148Site Visit (NT, SL): Details at 1:30 MST, power outage (data system goes down) at 7:41 MST, power back up at ~10:30 MST, quacker rebooted, data system back up |
28JD149 |
29JD150 |
30JD151 |
31JD152 |