Previous

Calendar

May

2006

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

30

JD120
Tower Power Down

1

JD121
Site Visit (SpB, JL): Details , Photos (37)

10AM, met with John L from rainbow elec.

at 11:30 MST, Power Restored to Tower

Transformer at C1 has a short-circuit---bypassed C1 and tower transformers to restore power.

Brought 4 empty cylinders back to campus.

Jeep Rental

2

JD122
Site Visit (SpB): Details , Photos (21)

at around 3:00 MDT, russter2 dropped off network, the data system stopped at 1:42AM..

power restored to trailer, tower power is off (indefinitely).

3

JD123
Site Visit (SpB, JL): Details , Photos (14)

10AM, met with John L from rainbow elec.

Tracked down the short-circuit: it's in a j-box which is near where the conduit passes the trail (about 200' from CU tower). Poor weather and a lack of time stopped us from reconnecting everything.

Tower Power Down

4

JD124
Tower Power Down

5

JD125
Tower Power Down

6

JD126
Tower Power Down

7

JD127
Tower Power Down

8

JD128 (blustery)
Site Visit (SpB, JL, JH, NT): Details , Photos (29)

8AM, met with John L from rainbow elec., JH, and NT at MRS

at ~11:30 MDT Power restored to CU Tower

9

JD129
Site Visit (MW): Details

soils sampled (MW)

10

JD130

11

JD131
Site Visit (JH, JB, KS): Details

Jeep Rental

12

JD132
Site Visit (SpB, JH, JB, KS): Details , Photos (27)

at ~10:30 MST, zeroed LI-6262 and adjusted span gas line pressure from 23 to 20psi.

at ~13:00 MST, replaced the battery at the N Canopy Tower (for tc logger).

Four-flask swap at East/West Robots

Jeep Rental

13

JD133
(Full "Flower" Moon)

14

JD134
Mothers Day

15

JD135
Summer Jeep Rental (starts)

16

JD136
Site Visit (LL, R): Details

17

JD137 (warm/sunny)
Site Visit (JH, KS): Details

"Pre-dawn" Transpiration Measurements.

18

JD138
Site Visit (SpB, JH, JB, KS): Details , Photos (34)

19

JD139 (hot/Cu)
Site Visit (SpB): Details , Photos (21)

20

JD140
Report Jeep Mileage to Lease Operations

21

JD141

22

JD142
AMS BLT/FOREST-MET Meeting

23

JD143
AMS BLT/FOREST-MET Meeting

24

JD144
AMS BLT/FOREST-MET Meeting

25

JD145
Site Visit (JB, KS): Details

Four-flask swap at the East/West Robots

AMS BLT/FOREST-MET Meeting

26

JD146

27

JD147

28

JD148

29

JD149
CU Holiday (Memorial Day)

30

JD150

31

JD151
Site Visit (JH, JB, AT): Details

"Pre-dawn" Transpiration Measurements (JH/JB).

Slow and Fast Ozone turned on (AT)

1

JD152 (hot/dry)
Site Visit (SpB, JH): Details , Photos (33)

from 10:00-10:30 MST, Changed profiler (li-6251) dessicant

East/West Robots both had done=2 (no swap)

2

JD153
Site Visit (JB, KS): Details

15-flask swap at the East/West Robots

3

JD154