Previous | Calendar |
June |
2006 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
28JD148 |
29JD149CU Holiday (Memorial Day) |
30JD150 |
31JD151Site Visit (JH, JB, AT): Details "Pre-dawn" Transpiration Measurements (JH/JB). Slow and Fast Ozone turned on (AT) |
1JD152 (hot/dry)Site Visit (SpB, JH): Details , Photos (33) from 10:00-10:30 MST, Changed profiler (li-6251) dessicant East/West Robots both had done=2 (no swap) |
2JD153Site Visit (JB, KS): Details 15-flask swap at the East/West Robots |
3JD154 |
4JD155 |
5JD156 |
6JD157Site Visit (SpB, JH, MP, JB, KS): Details , Photos (23) from 12:00-13:00 MST, replaced 2-micron Nupro filters on li-6262 from 11-12 MST, replaced domes on REBS Rnet sensor |
7JD158 |
8JD159SpB Off |
9JD160 |
10JD161 |
11JD162(Full "Strawberry" Moon) |
12JD163 |
13JD164 |
14JD165Flag Day |
15JD16615-flask swap at the East/West Robots (KS/JB) |
16JD167 |
17JD168 |
18JD169Fathers Day |
19JD170 |
20JD171Report Jeep Mileage to Lease Operations |
21JD172Summer Solstice |
22JD173 |
23JD174"Pre-dawn" Transpiration Measurements (KS/JB). 15-flask swap at the East/West Robots (KS/JB) |
24JD175SpB Returns |
25JD176 |
26JD177 |
27JD178Site Visit (SpB, JH, MP, JB, RM, SO, JS, LL, AT, CT): Details , Photos (21) from 10:45-11:15 MST, replaced N2 cylinder from ?-? MST, replaced li-6251 inlet filters (gelman) Meet with SO/RM/JS for tram scoping session |
28JD179 |
29JD180Site Visit (SpB, JH, JB, KS, CT): Details , Photos (14) Ameriflux IC w/ Chris Thomas (setup) from 13:00-13:15 MST, adjusted flow of N2/Span at li-6262 15-flask swap at the West Robot (KS/JB) |
30JD181Site Visit (SpB, CT): Details , Photos (17) Ameriflux IC w/ Chris Thomas (setup) "Pre-dawn" Transpiration Measurements (KS/JB). from 9:25-10:58 MST, replaced flux system inlet tubing from 11:12-11:31 MST, dessicant swap at li-6251 Pump removed from ozone flux system 15-flask swap at the East Robot (KS/JB) |
1JD182 |