Previous | Calendar |
April |
2006 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD85 |
27JD86 |
28JD87 |
29JD88 |
30JD89 |
31JD90CU Holiday (Spring Break) Site Visit (JH, MP, AT): Details slow-response ozone instrument turned on (AT) |
1JD91 |
2JD92Change from MST to daylight savings time (MDT). |
3JD93 |
4JD94 |
5JD95Site Visit (KR, MW): Details 160L LN2 Dewar is empty. Laser LN2 not filled. soils sampled (MW). |
6JD96 |
7JD97 |
8JD98 |
9JD99 |
10JD100 (blue skies)Site Visit (SpB, JH, JB): Details , Photos (30) from 12:30-14:15 MST, Moved check-valve for LI-6262 down to pump, changed out copper heat exchanger. 4-flask swap at East/West Robots |
11JD101 |
12JD102 |
13JD103(Full "Pink" Moon) |
14JD104Site Visit (AT): Details |
15JD105 |
16JD106Easter |
17JD107 |
18JD108 |
19JD109 (clear/cool)Site Visit (SpB, JH, MP, MW, M, NM): Details , Photos (26) from 10:35-10:40 MST, swiped the Krypton Hyg. from 11:10-12:00 MST, removed the loaner LI-6262 (sn IRG3-0224), and re-installed the Monson re-calibrated LI-6262 (sn IRG3-638) at 12:54 MST, made slight adjustment to LI-6262 zero for co2/h2o. from 13:06-13:23 MST, Changed profiler (li-6251) dessicant from 13:30-13:40 MST, replaced N2 cylinder (new cyl= CC17728 at 1900 psi). 4-flask swap at East/West Robots Snow spectrometer measurements (NM) Prius Rental |
20JD110 |
21JD111 |
22JD112Earth Day. |
23JD113 |
24JD114 (snow) |
25JD115 |
26JD116 (Cu/warm)Site Visit (SpB, JH, SS): Details , Photos (34) Transported three cylinders of N2 out to the tower. No flasks swapped (but East Robot seems ok now) Sean S. added more inlet levels to the TDL Brought 3 empty cylinders back to campus. Jeep Rental (drove up to C1) |
27JD117Sean S. working on TGA at 22:10 MST, quacker data system stopped. |
28JD118Site Visit (SpB, ML, SS): Details , Photos (22) Sean S. finished work on TGA at around 1:00 MDT, russter2 dropped off network, power to the tower and trailer was down. at around 12:00 MST, power to trailer restored (thanks to ML/MO/KC) Tower Power Down |
29JD119Tower Power Down |
30JD120Tower Power Down |
1JD121Site Visit (SpB, JL): Details , Photos (37) 10AM, met with John L from rainbow elec. at 11:30 MST, Power Restored to Tower Transformer at C1 has a short-circuit---bypassed C1 and tower transformers to restore power. Brought 4 empty cylinders back to campus. Jeep Rental |
2JD122Site Visit (SpB): Details , Photos (21) at around 3:00 MDT, russter2 dropped off network, the data system stopped at 1:42AM.. power restored to trailer, tower power is off (indefinitely). |
3JD123Site Visit (SpB, JL): Details , Photos (14) 10AM, met with John L from rainbow elec. Tracked down the short-circuit: it's in a j-box which is near where the conduit passes the trail (about 200' from CU tower). Poor weather and a lack of time stopped us from reconnecting everything. Tower Power Down |
4JD124Tower Power Down |
5JD125Tower Power Down |
6JD126Tower Power Down |