Previous | Calendar |
March |
2006 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD57 |
27JD58 |
28JD59 |
1JD60Site Visit (KR, MW): Details Soils Sampled (MW) Laser LN2 filled from 18 to 27cm. PFP swap. |
2JD61 (warm/calm) |
3JD62 |
4JD63 |
5JD64Site Visit (KR): Details Laser LN2 filled from 15 to 27.5cm. |
6JD65 (warm/calm)Site Visit (SpB): Details , Photos (35) from 11:25-11:30 MST, swiped krypton hygrometer from 12:15-13:01 MST, Removed LI-6262, now using IRG3-224 from 13:20-13:35 MST, Changed profiler (li-6251) dessicant 4-flask swap at East/West Robots |
7JD66 |
8JD67Site Visit (KR): Details Laser LN2 filled from 19 to 30cm. |
9JD68 |
10JD69 |
11JD70Site Visit (KR): Details Laser LN2 filled from 22 to 34cm. |
12JD71 |
13JD72 |
14JD73(Full "Worm" Moon) |
15JD74Site Visit (MW): Details Soils Sampled (MW) |
16JD75 |
17JD76 |
18JD77 |
19JD78Site Visit (KR): Details Laser LN2 filled from 20 to 40cm. |
20JD79 (snow)Spring Equinox |
21JD80 (snow) |
22JD81Site Visit (KR): Details Laser LN2 filled from 27cm to 40cm. N2 (ref) flow rate set to 8psi. |
23JD82spectrometer study (NM) |
24JD83 (warm)Site Visit (SpB, DM, AW, NM, D): Details , Photos (26) Helicopter fly-by at 10:30 MST, swiped krypton hygrometer from 12:50-13:30 MST, Added check-valve to the li-6262 ec at ~14:30 MST, swapped span gas (old cylinder=CC156367, new cylinder= CC86948, at 1800 psi) 4-flask swap at East/West Robots Laser LN2 filled from ~35cm to FULL (approx 40cm?). spectrometer study (NM) |
25JD84spectrometer study (NM) |
26JD85 |
27JD86 |
28JD87 |
29JD88 |
30JD89 |
31JD90CU Holiday (Spring Break) Site Visit (JH, MP, AT): Details slow-response ozone instrument turned on (AT) |
1JD91 |