Previous

Calendar

February

2006

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

29

JD29
Chinese New Year

30

JD30

31

JD31

1

JD32
Site Visit (NM, SS): Details

snow spectrometer measurements (NM).

2

JD33
Site Visit (SS, JM): Details

laser work.

3

JD34 (snow)

4

JD35
Site Visit (SpB): Details , Photos (19)

New N2 cylinder

Four-flask swap at East/West Robots (AUTO25NW.CSI, ver4 uploaded)

5

JD36 (windy/snow)
Site Visit (KR): Details

Laser LN2 filled from 15.5 to 27.5cm, moved lower inlets for laser up 10cm.

6

JD37

7

JD38

8

JD39

9

JD40

10

JD41

11

JD42

12

JD43
Site Visit (KR): Details

Laser LN2 filled from 9.5 to 20cm, Cal tanks adjusted to 3psi.

13

JD44
(Full "Snow" Moon)

14

JD45

15

JD46

16

JD47
"Red Snow" Event.

17

JD48

18

JD49

19

JD50
Site Visit (KR): Details

Laser LN2 filled from 2cm to 11.5cm. PFP swap.

20

JD51

21

JD52

22

JD53 (windy/cold)
Site Visit (SpB, NM): Details , Photos (21)

at 11:00am MST russter2 rebooted.

Laser LN2 filled from 3cm to 13cm. 160L Dewar at MRS is empty.

Four-flask swap at East/West Robots

Compact Rental

23

JD54

24

JD55
Site Visit (KR): Details

Laser LN2 filled from 5cm to 29cm. Adjusted Cal tanks A, B, and C delivery pressure to 3psi.

25

JD56

26

JD57

27

JD58

28

JD59

1

JD60
Site Visit (KR, MW): Details

Soils Sampled (MW)

Laser LN2 filled from 18 to 27cm. PFP swap.

2

JD61 (warm/calm)

3

JD62

4

JD63