Previous

Calendar

January

2006

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD1

2

JD2
CU Holiday

3

JD3 (snow/wind)
Site Visit (SpB): Details , Photos (22)

Connected KZ CNR-1 (rad_01.csi); still need to connect T.case (Pt-100)

added KZ CNR-1 data to data system (starts ops26)

Laser dewar topped off (from 0 to 11 cm)

2-d handar at 1.61m not working

Compact Rental

4

JD4

5

JD5
Site Visit (JM): Details

Laser dewar topped off (from 3.5 to 27 cm)

Fresh N2 cylinder connected to laser (1820 psi); 5% co2 at 1700 psi

6

JD6 (clear/windy)
Site Visit (SpB): Details , Photos (16)

at ~12:50 MST, power-cycled 2-d handar at 1.61m (seemed to fix problem)

from 14:00-14:18 MST, Changed profiler (li-6251) dessicant

at ~15:00 MST, Connected T.case (Pt-100) for KZ CNR1

Laser dewar topped off (from 24 to 35.5 cm)

7

JD7

8

JD8

9

JD9

10

JD10

11

JD11

12

JD12

13

JD13
Site Visit (JM): Details

Laser dewar topped off (from 16 to 33.5 cm)

14

JD14
(Full "Wolf" Moon)

15

JD15

16

JD16
CU Holiday (MLK, Jr. Day)

17

JD17

18

JD18

19

JD19

20

JD20
Site Visit (JM): Details

Pilots display installed for NOAA flasks.

21

JD21 (clear/windy)
Site Visit (SpB, DL): Details , Photos (11)

Laser dewar topped off (from 13.5 to 27 cm)

22

JD22
Site Visit (KR): Details

Laser dewar topped off (from 23.5 to 36 cm)

iLEAPS meeting

23

JD23
iLEAPS meeting

24

JD24
iLEAPS meeting

25

JD25
iLEAPS meeting

26

JD26
iLEAPS meeting + flux workshop

27

JD27
flux workshop

28

JD28
flux workshop

29

JD29
Chinese New Year

30

JD30

31

JD31

1

JD32
Site Visit (NM, SS): Details

snow spectrometer measurements (NM).

2

JD33
Site Visit (SS, JM): Details

laser work.

3

JD34 (snow)

4

JD35
Site Visit (SpB): Details , Photos (19)

New N2 cylinder

Four-flask swap at East/West Robots (AUTO25NW.CSI, ver4 uploaded)