Previous

Calendar

May

2003

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

27

JD117

28

JD118

29

JD119

30

JD120

1

JD121

2

JD122
Site Visit (SpB): Details , Photos (40)

met logger program appears to be updated (couldn't find the old version). the timing of the LI-6262 calibrations changes from 3, 7, 11, 15, 19, 23 MST to 0, 4, 8, 12, 16, 20

Set all cr23x logger clocks to MST.

3

JD123

4

JD124

5

JD125

6

JD126

7

JD127

8

JD128
Site Visit (T-seed, SpB): Details , Photos (20)

at 11:30 MST, Replaced li6262 (sn 638) with a loaner from LI-COR (sn irg3-169). (sent ours back to LI-COR for recal)

ATI is still having problems.

9

JD129

10

JD130

Snowstorm--Power Outages---Adam restarted.

LI-6262 turns itself off (the loaner will do this)

11

JD131
Mothers Day

12

JD132

13

JD133
Site Visit: Details , Photos (49)

turned LI-6262 back on

from XXXX-XXXX MST, Changed profiler (li-6251) dessicant

ATI still has problems, removed to bring to the ATI office in longmont


14

JD134

15

JD135

16

JD136

17

JD137

18

JD138
Power Outage.

LI-6262 turns itself off (the loaner will do this)

19

JD139

20

JD140
Site Visit (AT, SpB): Details , Photos (31)

Swapped span cal cylinder.

The "loaner" li-6262 lost power, so we needed to power it up again.

21

JD141

22

JD142
SpB Off

23

JD143

24

JD144

25

JD145
Bottom and Top Breaker pop.

LI-6262 turns itself off (the loaner will do this)

26

JD146
Memorial Day
Site Visit (AT): Details

reset breakers and LI-6262.

remounted ATI k-probe at 21.5m


27

JD147

28

JD148
Site Visit (AT): Details

reset bottom breaker.

SpB Returns

29

JD149

30

JD150
Site Visit (SpB): Details , Photos (43)

at 3am, power outage, breakers pop.

reset breakers and LI-6262.

T-seed out

31

JD151