Previous

Calendar

April

2003

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

30

JD89

31

JD90

1

JD91
Site Visit (AT, SpB, LSD, RM): Details

Messed around with the li-6262 (still trying to clean the sample cell to remove offset)

swapped N2 cylinder

turned on ozone system

Laura and Russ collected soil samples.

2

JD92

3

JD93

4

JD94

5

JD95

6

JD96

7

JD97

8

JD98

9

JD99

10

JD100
Site Visit (AT, SpB): Details , Photos (27)

Re-installed ATI sonic at 21.5m (but still was not working).

Installed fixed li-7500 at 21.5m (paired with ati). The li-7500 was fixed for the solar radiation problem.

Moved the li-7500 that was at 21.5m to the mini-tower (note, this li-7500 has the "homeade" radiation shield on it).

11

JD101

12

JD102

13

JD103

14

JD104

15

JD105

16

JD106

17

JD107

18

JD108
in the afternoon, both bottom and top breakers popped

19

JD109

20

JD110

21

JD111
Site Visit (AT): Details

at 10:30 MST, breakers reset, chan 200/201 ok again (lost data over the weekend)

22

JD112

23

JD113

24

JD114

25

JD115
Site Visit (AT, SpB): Details , Photos (64)

ATI sonic at 21.5m was not connected to quacker.

26

JD116

27

JD117

28

JD118

29

JD119

30

JD120

1

JD121

2

JD122
Site Visit (SpB): Details , Photos (40)

met logger program appears to be updated (couldn't find the old version). the timing of the LI-6262 calibrations changes from 3, 7, 11, 15, 19, 23 MST to 0, 4, 8, 12, 16, 20

Set all cr23x logger clocks to MST.

3

JD123