Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD152

2

JD153
Site Visit (SpB): Details , Photos (48)

T-seed out
reset upper breaker (it had popped).

3

JD154
Site Visit (RM,LSD,SPB,G/T/J): Details , Photos (27)

4

JD155

5

JD156
Site Visit (AT,SPB): Details , Photos (35)

Re-installed our li-6262 and removed the "loaner".

6

JD157

7

JD158

8

JD159
Quacker-4am Shutdown

9

JD160

10

JD161
Site Visit (SpB): Details

Started ops7 (moved MET logger from chan 202 to chan 204 (a "free" port on edgeport) to try and fix "dropout" problem..it didn't help)

11

JD162

12

JD163

13

JD164
Site Visit (AT,SPB,RM,BB,G/T/J): Details , Photos (14)

14

JD165
Flag Day

15

JD166
Fathers Day

16

JD167

17

JD168
Site Visit (AT,SPB,RM,BB,G/T/J): Details , Photos (21)

18

JD169

19

JD170

20

JD171
Site Visit (AT,SpB,RM,T/J): Details

21

JD172
Summer Solstice

22

JD173

23

JD174

24

JD175
Site Visit (SPB,RM,BB,S): Details , Photos (16)

Moved 1.5m csat up to 5.7m.

Moved 6m 2-d handar down to 1.61m (didn't seem to be working).

25

JD176

26

JD177

27

JD178
Site Visit (AT,SpB): Details

Power-cycled the 2-d handar at 1.61m and it seemed to be working ok.

28

JD179
Site Visit (SpB): Details

29

JD180
Site Visit (AT,SpB,DB,AS): Details

30

JD181
Site Visit (AT,SpB,DB,AS,SS): Details , Photos (5)

Bowling (install Robot and moved TDL to tower)

Started ops8 (added DB 8m csat and c12o2/c13o2 to tower data system, chan 202)

1

JD182
Site Visit (SpB,DB,AS,SS): Details , Photos (18)

(1st night TDL collects data)

2

JD183
Site Visit (SpB,DB,AS,SS): Details

(zero gradient test)

3

JD184
Site Visit (SpB,DB,AS,SS): Details , Photos (7)

(add TDL inlets on tower)

4

JD185
Independence Day

5

JD186
Site Visit (SpB,DB,SS): Details