June |
2003 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD152 |
2JD153Site Visit (SpB): Details , Photos (48) T-seed out reset upper breaker (it had popped). |
3JD154Site Visit (RM,LSD,SPB,G/T/J): Details , Photos (27) |
4JD155 |
5JD156Site Visit (AT,SPB): Details , Photos (35) Re-installed our li-6262 and removed the "loaner". |
6JD157 |
7JD158 |
8JD159Quacker-4am Shutdown |
9JD160 |
10JD161Site Visit (SpB): Details Started ops7 (moved MET logger from chan 202 to chan 204 (a "free" port on edgeport) to try and fix "dropout" problem..it didn't help) |
11JD162 |
12JD163 |
13JD164Site Visit (AT,SPB,RM,BB,G/T/J): Details , Photos (14) |
14JD165Flag Day |
15JD166Fathers Day |
16JD167 |
17JD168Site Visit (AT,SPB,RM,BB,G/T/J): Details , Photos (21) |
18JD169 |
19JD170 |
20JD171Site Visit (AT,SpB,RM,T/J): Details |
21JD172Summer Solstice |
22JD173 |
23JD174 |
24JD175Site Visit (SPB,RM,BB,S): Details , Photos (16) Moved 1.5m csat up to 5.7m. Moved 6m 2-d handar down to 1.61m (didn't seem to be working). |
25JD176 |
26JD177 |
27JD178Site Visit (AT,SpB): Details Power-cycled the 2-d handar at 1.61m and it seemed to be working ok. |
28JD179Site Visit (SpB): Details |
29JD180Site Visit (AT,SpB,DB,AS): Details |
30JD181Site Visit (AT,SpB,DB,AS,SS): Details , Photos (5) Bowling (install Robot and moved TDL to tower) Started ops8 (added DB 8m csat and c12o2/c13o2 to tower data system, chan 202) |
1JD182Site Visit (SpB,DB,AS,SS): Details , Photos (18) (1st night TDL collects data) |
2JD183Site Visit (SpB,DB,AS,SS): Details (zero gradient test) |
3JD184Site Visit (SpB,DB,AS,SS): Details , Photos (7) (add TDL inlets on tower) |
4JD185Independence Day |
5JD186Site Visit (SpB,DB,SS): Details |