28JD179 |
29JD180at around 10 MST, the CNR4 logger stops sending data to the RAD/CNR logger (suspect a power/battery issue) SpB Returns |
30JD181 |
1JD182 |
2JD183 |
3JD184CU Holiday (Day before Independence Day) |
4JD185At 15:25 MST, turned off LI-7200 fan since flow rate was ~5 slpm Independence Day |
5JD186 |
6JD187 |
7JD188Site Visit (HR): Details, HR Photos (16) at 10:25 MST, used AC/DC power converter to power CNR4 CR23X logger. Battery voltage before using the adapter was ~0.3 V. at 10:38 MST, swapped LI-7200 inlet. Post-swap motor drive: 88%, flow rate: 10.5 slpm. HR Jeep Partly cloudy, smoky, calm, hot and dry |
8JD189In Lab/Cristol (SpB, PB): Details , Photos (9) cleaned up the lab space (the Cristol building to be renovated; must move out of lab in May/June 2027) did data backups, see: usb_disk_western_digital_my_passport_5Tb.txt, usb_disk_seagate_onetouch_5Tb.txt |
9JD190Site Visit (DB, +): Details Dave B. visited the site and found the rechargeable batteries in the teros11 logger were not working properly. He installed the spare alkaline batteries and then it worked ok. |
10JD191 |
11JD192 |
12JD193 |
13JD194In Lab/Cristol (SpB): Details , Photos (3) |
14JD195 |
15JD196Site Visit (HR): Details, HR Photos (6) at 10:24-36 MST, swapped LI-7200 inlet. Post-swap motor drive: 60%, flow rate: 10.5 slpm. moved 7 batteries from C-1 to MRS snowshed to be removed by CU EHS there was a power outage from 12:20-14:30 MST, lost contact with the site HR Jeep sunny, calm, hot and dry |
16JD197 |
17JD198 |
18JD199 |
19JD200 |
20JD201 |
21JD202 |
22JD203 |
23JD204 |
24JD205 |
25JD206 |
26JD207 |
27JD208Data from the UC CR23X stopped transmitting to the datasystem |
28JD209 |
29JD210Site Visit (HR, SpB, DB + CSU folks): Details, SpB Photos (28) , HR Photos (6) Downloaded data from all loggers tried to download the SD card data from the MRS logger (did not work). moved several boxes from the Cristol lab up to the trailer Attempted to get UC CR23X coms with the datasystem back up, but the problem was found in a Black BOx short haul modem, which we did not have a replacement for LI-6262: SpB bypassed the flow valves to pull sample gas into the LI-6262 directly, but the cell pressure is now too high, so the LI-6262+pump will be shut off again on next visit removed metal tables from trailer (taken to MRS); cleaned out some trailer trash HR Jeep afternoon thunderstorms |
30JD211 |
31JD212 |
1JD213 |