Previous

Calendar

June

2026

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

31

JD151

1

JD152

2

JD153

3

JD154

4

JD155
SD/Aylin/others to measure trees and collect cores (start)

5

JD156

6

JD157

7

JD158
at ~1600 MDT, the 2.5 m LI-7500A stopped working.

8

JD159
SD/Aylin/others to measure trees and collect cores (end)

9

JD160

10

JD161

11

JD162
In lab (HR)
prep for site visit

12

JD163
Site Visit (HR, SpB): Details , HR Photos (7)

AP200 N2 cylinder: 600 psi

from 10:00-10:30 MST, removed 2.5-m REBS Rnet sensor and LI-7500A. Updated UCB programming to remove REBs and snow depth measurements at ~15:00 MST

removed fallen tree from NE tower guy wire and re-measured tension (~900 lb pre-tree removal, ~425 lb post-tree removal)

Downloaded all data except Bowling logger. Turned off NOAH logger. Downloaded data and replaced batteries in zentra logger.

From ~13:30-15:00 MST, swapped out LI-7200s. SN72H-0539 is now on the tower and SN L2H-1033 is back in Boulder to be sent back to LBL.

from 15:35-15:45 MST, adjusted AP200 N2 flow rate

HR Jeep

Partly cloudy and windy

13

JD164

14

JD165

15

JD166

16

JD167

17

JD168

18

JD169

19

JD170

20

JD171

21

JD172
Summer Solstice

22

JD173
SpB Off

23

JD174

24

JD175

25

JD176

26

JD177

27

JD178

28

JD179

29

JD180
SpB Returns

30

JD181

1

JD182

2

JD183

3

JD184

4

JD185