Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
27JD208 |
28JD209 |
29JD210 |
30JD211 |
31JD212 |
1JD213 |
2JD214 |
3JD215 |
4JD216Site visit (HR, BK, MR; CSU: DB, RE, AB, HL): Details , HR Photos (3) span cylinder: 50 psi, N2: 1700 psi emptied pluvios at 10:50 MDT *Xcel was doing powerline work and shut power off at/above C-1 from 8:00-16:00 MDT* DB installed CRNS on SW corner of N canopy tower HR's jeep sunny, ~20C, calm SpB Off |
5JD217 |
6JD218Site visit (HR): Details , HR Photos (11) span cylinder: 50 psi, N2: 1700 psi replaced span cylinder ff66936 with ff66921 replaced UCB battery and maintainer with the spares in the shed fully plugged blue serial cable back into NCTC so it can connect to the data system HR's jeep hot and windy |
7JD219 |
8JD220 |
9JD221 |
10JD222 |
11JD223 |
12JD224Visit planned by AB/SM (Start) |
13JD225Visit planned by AB/SM SpB Returns |
14JD226Visit planned by AB/SM |
15JD227Visit planned by AB/SM |
16JD228Visit planned by AB/SM (End) |
17JD229 |
18JD230 |
19JD231 |
20JD232at 8:00 MDT, reboot of urquell |
21JD233 |
22JD234 |
23JD235 |
24JD236 |
25JD237 |
26JD238 |
27JD239 |
28JD240 |
29JD241 |
30JD242 |