Previous | Calendar |
April |
2023 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD85 |
27JD86CU Spring Break (start) In AM: new snow |
28JD87SpB Off |
29JD88 |
30JD89 |
31JD90CU Holiday (Spring Holiday) at around 16:15 MST, the 21.5m LI-7500A (op2) and LI-7200 rebooted (likely power outages?) Very windy and snowy |
1JD91lost network contact with the tower for part of the day (no sign of any power outage) Windy |
2JD92 |
3JD93 |
4JD94In AM: new snow (4-6 inches) |
5JD95 |
6JD96(Full "Pink" Moon) |
7JD97 |
8JD98 |
9JD99Site Visit (SpB): Details , Photos (36) Span cylinder at 200 psi, N2 at 1600 psi at 11:55 MST, cleared wet (and dirty!) snow off the forest PolaRx5 GPS "B" antenna at 12:15 MST, swapped SD card from GPSCAM at 12:20 MST, downloaded PolaRx5 GPS "B" (sn 3227662) data files (in forest) at 13:30 MST, downloaded PolaRx5 GPS "A" (sn 3062189) data files (tower top) downloaded data from Andrews CR800 and CR1000 SpB Prius Breezy and warm (clear skies) Easter |
10JD100 |
11JD101 |
12JD102warm |
13JD103 |
14JD104rain/snow/fog |
15JD105 |
16JD106at 9:10 MST, LI-6262 (Gast) pump stops working |
17JD107 |
18JD108Site Visit (SpB): Details , Photos (39) Span cylinder at 50 ---> 1800 psi, N2 at 1500 psi at 14:20 MST, swapped span cylinder; old=cc235629 new=cc477126 moved n2 cylinder eb0033789 from C-1 trailer to tga shed moved span cylinder cc235629 from tower base to C-1 trailer from 10:55-11:12 MST swapped the 21.5m LI-7200 inlet moved the 21.5m LI-7200 inlet from the left to right-side of "EOL" CSAT3 the LI-6262 inlet broke off in the wind; created a new inlet (photos show old inlet was there on 3/24) replaced the 2-micron Nupro filters in LI-6262 system (both at inlet and in the box) from 13:00-13:30 MST, replaced the LI-6262 Gast pump at 14:55 MST, downloaded PolaRx5 GPS "B" (sn 3227662) data files (in forest) at 15:05 MST, swapped SD card from GPSCAM NOTE: no snow on the forest PolaRx5 GPS "B" antenna Enterprise mid-size Warm, some wind gusts (the melt is ON) |
19JD109 |
20JD110 |
21JD111at around 22:00 MST, the 21.5m LI-7500A (OP2) starts having issues (continue on/off till ?) |
22JD112Earth Day. |
23JD113 |
24JD114SpB Off |
25JD115In PM: snow |
26JD116 |
27JD117 |
28JD118 |
29JD119 |
30JD120 |
1JD121In Lab/Cristol (SpB): Details , Photos (9) added two new 6V batteries to the base of cr23x sn 2262 powered up the ap200 profile system (pump off; LI-850 connected) |
2JD122NOTE: Order gast pump!! |
3JD123SpB Off |
4JD124SpB Off |
5JD125SpB Off |
6JD126 |