Previous

Calendar

March

2013

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

24

JD55

25

JD56

26

JD57

27

JD58

28

JD59

1

JD60

2

JD61

3

JD62
at approx 7 MST, a brief power outage

4

JD63

5

JD64
Site Visit (SpB): Details , Photos (24)

Span cylinder at 1150 psi. N2 at 900 psi

from 12:30 - 13:45 MST, swapped LI-6262 with loaner from LI-COR

at 14:00 MST, re-zeroed loaner LI-6262 h2o/co2

CU Prius

Clear & cool.

6

JD65

7

JD66
SpB Off

8

JD67

9

JD68

10

JD69

11

JD70

12

JD71

13

JD72

14

JD73

15

JD74

16

JD75

17

JD76
SpB/PsT in JiaoXi!!

18

JD77

19

JD78

20

JD79
Spring Equinox
SpB Returns

21

JD80

22

JD81

23

JD82

24

JD83

25

JD84

26

JD85

27

JD86

28

JD87
Site Visit (SpB): Details , Photos (35)

Span cylinder at 1000 psi. N2 at 250 psi (replaced) --> 1750 psi

at 10:30 MST, rebooted russter2

at 11:50 MST, started ops63 (added medtherm TC), new FAST logger program (fast_16.csi).

at ~14:00 MST, added KZ PAR-LITE sensor as PAR2.up to CNR logger

at 16:40 MST, adjusted LI-6262 cal gas flows

SpB Jeep

Calm & warm.

29

JD88
Spring Break (CU Holiday)

30

JD89

31

JD90

1

JD91
Note: at about 16:30 MST (positive) spike in t.med; it was snowing lightly, with calm winds

2

JD92
between 8-9:30 MST, something strange happened with LI-7200 co2, h2o seems ok (check this)

3

JD93

4

JD94

5

JD95

6

JD96