Previous

Calendar

February

2013

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

27

JD27

28

JD28

29

JD29

30

JD30

31

JD31

1

JD32

2

JD33

3

JD34

4

JD35
from 16:20-17:01 MST, power outage

NACP Meeting (New Mexico), start

5

JD36

6

JD37

7

JD38
NACP Meeting (New Mexico), end

8

JD39
Site Visit (SpB): Details , Photos (29)

Span cylinder at 1400 psi. N2 at 1500 psi

at approx 14:15 MST, swiped krypton hygrometer

from 14:30-15:00 MST, replaced the 2-micron Nupro filter in LI-6262 box

at 14:55 MST, adjusted LI-6262 cal gas flow rate

at 15:15 MST, re-leveled the CNR-2 sub-canopy sensor

SpB Jeep

Warm, sunny, calm.

9

JD40

10

JD41

11

JD42

12

JD43

13

JD44

14

JD45
sometime in the afternoon, the LI-6262 pump dies

some snow.

15

JD46

16

JD47

17

JD48
Site Visit (SpB): Details , Photos (13)

Span cylinder at 1300 psi. N2 at 1310 psi

at 12:15 MST, replaced LI-6262 gast pump

at 12:25 MST, zeroed LI-6262 h2o/co2 (as much as possible)

CU Prius

Windy, clear & cool.

18

JD49

19

JD50
a brief power outage (time?)

SpB Off (FMA)

20

JD51
SpB Off (FMA)

21

JD52

22

JD53

23

JD54

24

JD55

25

JD56
sometime in afternoon, Ttc.2 (UCB logger) stops working

26

JD57

27

JD58

28

JD59

1

JD60

2

JD61