Previous

Calendar

August

2012

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

29

JD211

30

JD212
Significant storm (in afternoon).

at approx 14:12 MST, input from the CNR logger stops (lightning?)

at approx 16:45 MST, data system shuts down

31

JD213
Site Visit (SpB): Details , Photos (15)

at approx 12:40 MST, data system back on (gfi outlet at tower tripped)

Moved Picarro line-pump off the gfi outlet (to the shed power strip)

RH from 2m T/RH sensor still not working

micro-pump for co2 prof system not working

Some clouds, but no rain or lightning.

SpB Jeep

1

JD214
Site Visit (MB): Details

MB shutown Picarro (overheating of shed)

(Full "Sturgeon" Moon)

2

JD215

3

JD216

4

JD217

5

JD218

6

JD219

7

JD220
SpB to RBA (Start)

8

JD221
Trip to service RBA AIRCOA: photos (45)

9

JD222
SpB Returns

10

JD223

11

JD224

12

JD225
Site Visit (SpB): Details , Photos (1)

at approx 12:00 MST, removed russter2 and transported to Boulder (data system DOWN)

Some clouds, pleasant.

PsT BMW

13

JD226
Site Visit (SpB): Details , Photos (11)

at approx 15:00 MST, moved russter2 back to C1 and re-started data system

Cool weather.

SpB Jeep

at 11 PM, urquell reboot.

14

JD227

15

JD228

16

JD229
Site Visit (SpB): Details , Photos (21)

Span cylinder at 800 psi. N2 at 500 psi

from 10:30-13:00 MST, replaced micro-pump in prof system (li-6251) [Only zero gas connected!]

at 11:44 MST, changed span/n2 flow in LI-6262.

at 12:15 MST, re-started ati k-probe (will it work?).

Calm, cool weather (some rain in afternoon). A bit hazy/smokey.

CU Prius

17

JD230

18

JD231

19

JD232

20

JD233

21

JD234

22

JD235
at approx 15:00 MST, LI-7500 at 12.5m looking odd? (precip?)

23

JD236

24

JD237

25

JD238

26

JD239

27

JD240
Site Visit (SpB): Details , Photos (28)

Span cylinder at 750 psi. N2 at 200 psi

from 13:10-14:00 MST, replaced nu-pro filters and tubing in EC/LI-6262 system

from approx 11:01-11:19 MST, Changed profiler (li-6251) dessicant

Sunny, then clouded up.

SpB Jeep

28

JD241

29

JD242
at 3pm, NESL Town Hall meeting (CG1)

30

JD243
at 3pm, MMM meeting w/ Roger W

31

JD244
at approx 9:27 MST, brief (56 second) power outage

(Full "Corn" Moon)

1

JD245