Previous

Calendar

July

2012

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD183
Site Visit (SpB): Details , Photos (29)

Span cylinder at 1200 psi. N2 at 1600 psi

at 9:10 MST, flipped on breaker in beatle shed

from 10:22-10:38 MST, swapped dessicant + replaced 2-micron Nupro filter in LI-6251 system

from 10:58-11:00 MST, swiped the Krypton Hyg.

at 12:15 MST, decreased N2/span flow in li-6262

Hot and dry. Some Cu clouds.

SpB Jeep

2

JD184

3

JD185
(Full "Buck" Moon)

4

JD186
Independence Day

5

JD187
Note: h2o.li7200 is clipped at 5V (for most of afternoon)

6

JD188

7

JD189
Short power outage.

8

JD190

9

JD191
BLT Meeting Starts

10

JD192

11

JD193

12

JD194

13

JD195
BLT Meeting Ends

14

JD196

15

JD197

16

JD198
Flux Class at MRS (start)

17

JD199

18

JD200

19

JD201
Site Visit (SpB, DB, MB, RM, etc): Details , Photos (24)

Span cylinder at 1010 psi. N2 at 1110 psi

from 11:15-11:30 MST, cleaned 2m T/RH sensor (note, RH is not working)

Max restarted Picarro Instrument (and AC unit in the shed)

at 10:45 MST, swiped the Krypton Hyg.

at 12:10 MST, decreased N2/span flow in li-6262

in afternoon, flux class visited site

Cu clouds.

SpB Jeep

20

JD202

21

JD203

22

JD204

23

JD205
GTP Meeting (start)

24

JD206
micro-pump for LI-6251 stops working!!

25

JD207

26

JD208
Site Visit (MB): Details

MB fixed network to TDL shed (network port failed?)

27

JD209
Site Visit (SpB): Details , Photos (30)

Span cylinder at 950 psi. N2 at 910 psi

at approx 11:30 MST, power outage (back on at 14:50 MST)

from 11:30-12:30 MST, swapped EOL CSAT sn 0674 (ver 3) with Blanken CSAT sn 0254 (ver 4).

from 15:00-16:10 MST, capped the N2 and span line to the li-6251 (to save gases)

at 16:15 MST, slightly decreased N2/span flow in li-6262

Note: Back-UPS 650 battery acted strange after power came back on

RH from 2m T/RH sensor still not working

micro-pump for co2 prof system not working

Variable Weather (incl storms/rain).

SpB Jeep

GTP Meeting (end)

Flux Class at MRS (end)

28

JD210

29

JD211

30

JD212
Significant storm (in afternoon).

at approx 14:12 MST, input from the CNR logger stops (lightning?)

at approx 16:45 MST, data system shuts down

31

JD213
Site Visit (SpB): Details , Photos (15)

at approx 12:40 MST, data system back on (gfi outlet at tower tripped)

Moved Picarro line-pump off the gfi outlet (to the shed power strip)

RH from 2m T/RH sensor still not working

micro-pump for co2 prof system not working

Some clouds, but no rain or lightning.

SpB Jeep

1

JD214
Site Visit (MB): Details

MB shutown Picarro (overheating of shed)

(Full "Sturgeon" Moon)

2

JD215

3

JD216

4

JD217