Previous

Calendar

April

2012

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD92

2

JD93

3

JD94
at approx 13:05 MST, LI-7200 sample rate changed from 20-Hz back to 10-Hz

4

JD95

5

JD96
T11 appears to be broken.

6

JD97
(Full "Pink" Moon)

K.Steffan Seminar, IBS, 3pm.

7

JD98

8

JD99
Easter

9

JD100

10

JD101

11

JD102

12

JD103

13

JD104

14

JD105

15

JD106

16

JD107

17

JD108

18

JD109

19

JD110
Site Visit (SpB, MB, E, S): Details , Photos (32)

Span cylinder at 100 psi (replaced) --> 1800 psi. N2 at 1490 psi

at 13 MST, swapped span cylinder; old=sg9166747 new= cc240401

Max & Co setup AC unit in TGA shed

from approx 12:55-13:10 MST, Changed profiler (li-6251) dessicant

at ~13:15 MST, adjusted cal gas flows in LI-6262.

at ~13:45 MST, fixed NCTC chan11 (16 m tc).

Variable mix of sun, clouds, wind, snow.

CU Prius

20

JD111

21

JD112

22

JD113
Earth Day.

23

JD114

24

JD115
Meet with PB from 2-2:30 pm

25

JD116

26

JD117
Meet with NM,MW,PB from 11:30-12:30 pm

Meet with PB from 2-3 pm

at approx 15:30 MST, changed LI-7200 "bandwidth" setting from 20-Hz to 5-Hz; also changed co2 DAC 0-5V output range to 360-450 ppm (old value was 330-430 ppm)

27

JD118

28

JD119

29

JD120

30

JD121

1

JD122

2

JD123

3

JD124

4

JD125

5

JD126
(Full "Flower" Moon)