Previous

Calendar

March

2012

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD57

27

JD58

28

JD59

29

JD60

1

JD61

2

JD62

3

JD63

4

JD64

5

JD65

6

JD66
Very Warm at the site (lowest co2 inlet tubing now "unfrozen"?)

7

JD67

8

JD68
(Full "Worm" Moon)

9

JD69
Site Visit (SpB): Details , Photos (27)

Span cylinder at 400 psi. N2 at 400 psi

from approx 14:18-15:12 MST, Changed profiler (li-6251) micropump (KNI unmp30)

from 15:29-15:33 MST, swiped the Krypton Hyg.

at 15:45 MST, exhaled near LI-6262 inlet (as a leak check)

downloaded all logger data

Warm, calm, sunny.

10

JD70
Change from MST to daylight savings time (MDT).

11

JD71

12

JD72

13

JD73

14

JD74

15

JD75

16

JD76

17

JD77

18

JD78

19

JD79
Spring Equinox

20

JD80
at approx 13:05 MST, changed LI-7200 "chopper temperature" from 5 degC to 30 degC

21

JD81

22

JD82

23

JD83

24

JD84

25

JD85

26

JD86
CU Spring Break

27

JD87

28

JD88
at approx 13:10 MST, LI-7200 sample rate changed to 20-Hz

29

JD89
Site Visit (SpB): Details , Photos (35)

Span cylinder at 400 psi. N2 at 20 psi --> 2000 psi

at 15 MST, swapped N2 cylinder; old=cc63143 new= cc329215

at ~11:05 MST, rebooted russter2.

from 13:45-14:30 MST, checked for leaks in N2 cal tubing to LI-6262, seemed ok.

at 14:00 MST, went back to running "met_07.csi" on MET logger (re-started calibrations of LI-6262)

Warm and sunny.

30

JD90
CU Holiday (Spring Break)

31

JD91