Previous | Calendar |
October |
2010 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD269 |
27JD270before Noon MDT: a rapid increase in RH, but Ta approx unchanged (a front passing by?) |
28JD271Site Visit (SpB, NT, LY, J, M): Details , Photos (25) Span cylinder at 680 psi. N2 at 1850 psi. from 10:30-11:30 MST, moved eol TRH sensor from 21.5m down to 8m from 12:30-14:00 MST, swapped out 21.5m csat with one from campbell (get SNs) Sunny & warm. CU Jeep |
29JD272 |
30JD273Site Visit (SpB): Details , Photos (19) Span cylinder at 650 psi. N2 at 1800 psi. at approx 12:00 MST, removed the KZ PAR-LITE sensor (PAR2.up) from the CNR logger from 13:00-13:30 MST, changed li-6251 dessicant & replaced 2-micron nupro filter Sunny & warm (again). CU Jeep Summer Jeep Rental (ends at 20:00) |
1JD274 |
2JD275 |
3JD276 |
4JD277 |
5JD278 |
6JD279 |
7JD280 |
8JD281A dusting of snow. |
9JD282 |
10JD283 |
11JD284Columbus Day |
12JD285First significant snowfall of the season (5-6"?). |
13JD286 |
14JD287Site Visit (SpB): Details , Photos (19) Span cylinder at 500 psi. N2 at 1400 psi. moved 4 new span gases to the trailer turned off fan in 6251 box Sunny/warm/dry. CU Jeep |
15JD288 |
16JD289 |
17JD290 |
18JD291 |
19JD292 |
20JD293 |
21JD294SpB at SPL |
22JD295SpB at SPL |
23JD296 |
24JD297 |
25JD298Strong winds. |
26JD299Strong winds continue |
27JD300u.atik at 12m looks strange? (perhaps an ice/snow problem?) windy/cold |
28JD3012m csat is noisy |
29JD302Site Visit (SpB): Details , Photos (25) Span cylinder at 350 psi. N2 at 950 psi. between approx 11:00-12:30 MST, power outage at the site; data system down from 14:22-14:37 MST, Changed profiler (li-6251) dessicant (note, the line was pinched(?), fixed again around 16:00 MST) Windy/cool. CU Prius |
30JD303 |
31JD304Halloween |
1JD305 |
2JD306NOTE: li-6251 pressure has been varying dramatically since the dessicant swap on 10/29 (but co2.prof seems mostly unaffected?) |
3JD307LI-6262 cal at 8am MST was incomplete (stuck valve?) |
4JD308Site Visit (SpB): Details , Photos (33) Span cylinder at 300 psi. N2 at 800 psi. at approx 10:30 MST, swiped krypton hygrometer from 10:37-10:47 MST, swapped profiler (li-6251) dessicant tubes, also check wires, tubing, etc Calm/Warm/High Clouds. SpB Jeep |
5JD309 |
6JD310 |