Previous | Calendar |
May |
2009 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD116Power Outage from around 10:30-13:30 MST russter2 goes down (and stays down). data system shuts down. |
27JD117Site Visit (JK): Details at ~9:35 MST, John Knowles (CU) reboots russter2 at ~9:50 MST, restarted ndaq on quacker, things look ok. |
28JD118 |
29JD119 |
30JD120 |
1JD121 |
2JD122Power Outage at C-1 from around 14:00-15:20 MST russter2 goes down (and stays down). data system shuts down. |
3JD123Site Visit (SpB): Details , Photos (12) Span cylinder at 550 psi. N2 at 1570 psi. at ~10:00 MST, rebooted russter2, restarted data system. at ~12:20 MST, re-arranged plugs into UPS outlets. Unplugged UPS to test (see details). hauled N2 CC264924 to the tower. Calm. 1-2" Fresh snow. Partly Cloudy with some big Cu lurking. |
4JD124 |
5JD125 |
6JD126 |
7JD127 |
8JD128Site Visit (NT): Details Summer Jeep Rental (starts); moved from 5/11 SpB at FEF |
9JD129 |
10JD130Calm. 1-2" Fresh snow. |
11JD131 |
12JD132Site Visit (SpB): Details , Photos (16) Snowcat to Tvan. SpB at NWR |
13JD133 |
14JD134SpB at HDP |
15JD135SpB at HDP |
16JD136 |
17JD137 |
18JD138 |
19JD139Site Visit (SpB): Details , Photos (34) Span cylinder at 450 psi. N2 at 1270 psi. at ~12:30 MST, Plugged in fan for quacker box. hauled span CC245057 to the tower. Partly Cloudy; with some big Cu. Warm & Pleasant. |
20JD140 |
21JD141 |
22JD142 |
23JD143Site Visit (DB): Details |
24JD144 |
25JD145CU Holiday (Memorial Day) |
26JD146Mon Night: Heavy Rain. Mixed w/ snow. |
27JD147Site Visit (SpB, NT, SL, L, R, LSD, L, CG, LL, T, SO): Details , Photos (36) Span cylinder at 400 psi. N2 at 1080 psi. cleaned trailer. from 12:30-12:50 MST, replaced Tripp-lite battery (LI-CORs off) from 12:50-13:20 MST, Changed profiler (li-6251) dessicant + adjusted li-6262 flows Partly Cloudy. Calm winds. Warm & Pleasant (bug-free). Snow is melting quickly. |
28JD148Note: the 2-d ATI sonic seems to be having some problems (power-cycle it?). |
29JD149 |
30JD150 |
31JD151at ~13:30 MST, Data system crashes (Edgeport/8 dies) |
1JD152Site Visit (SpB, NT, SL, L, L, CG): Details , Photos (18) Span cylinder at 400 psi. N2 at 1080 psi. at ~10:00 MST, swapped out Edgeport/8, data system back up. Wet and drizzly (some thunder in distance). |
2JD153at 10:50 MST, the flow rate in the li-6262 system drops significantly (check the GAST pump and/or filters)... |
3JD154 |
4JD155Site Visit (SpB, LL, SL, LY): Details , Photos (9) Span cylinder at 300 psi. N2 at 900 psi. from 11:00-11:26 MST, replaced 2-micron Nupro filters in LI-6262 system (both at inlet and in the box) PAR installation work. Warm and pleasant (some clouds in the afternoon and a light sprinkle of rain). |
5JD156 |
6JD157at 17:20 MST, chan 201 (fast logger) stops sending out data |