Previous

Calendar

March

2009

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD60

2

JD61

3

JD62

4

JD63
Site Visit (SpB, JH, SL): Details , Photos (13)

Span cylinder at 1100 psi. N2 at 1400 psi.

Very warm. A bit windy.

Prius Rental

5

JD64

6

JD65

7

JD66

8

JD67
Change from MST to daylight savings time (MDT).

9

JD68

10

JD69
Power Outage from around 12:00-15:00

russter2 goes down (and stays down). data system shuts down.

11

JD70
Site Visit (SpB): Details , Photos (19)

Span cylinder at 1000 psi. N2 at 1150 psi.

at around 10:30 MST, russter2 back up. data system back up.

"Tripp lite" power/strip UPS for LI-CORs is dead.

Bright and sunny.

12

JD71

13

JD72
Site Visit (NT, SL):

14

JD73

15

JD74

16

JD75

17

JD76

18

JD77

19

JD78
Extremely calm morning.

20

JD79
Site Visit (NT, SL):

21

JD80
Site Visit (NT, SL):

22

JD81

23

JD82

24

JD83

25

JD84
Site Visit (NT, SL): Details

26

JD85
Snowstorm.

27

JD86
CU Holiday (Spring Break)

28

JD87
Site Visit (SpB): Details

Span cylinder at 820 psi. N2 at 700 psi.

Blustery + 8-10" of fresh'ish snow.

29

JD88

30

JD89

31

JD90

1

JD91
Site Visit (SpB, NT, SL): Details , Photos (21)

Span cylinder at 800 psi. N2 at 600 psi.

between 9:30-10:00 MST, rebooted russter2, checked BIOS.

Overcast, mostly calm. A few inches of fresh snow.

2

JD92

3

JD93
SpB off (half-day)

4

JD94