Previous | Calendar |
September |
2008 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
31JD244 |
1JD245CU holiday (Labor Day) |
2JD246Site Visit (JB, NT): Details , Photos (6) N2 @ 300 psi, span @ 1700 psi swapped 15 flasks at the west robot |
3JD247 |
4JD248JB at site (Merced day) span @ 1700 psi swapped N2 tanks at the tower. retired N2 cc193097 and started cc1255575 @ 1925 psi SpB Returns |
5JD249 |
6JD250 |
7JD251 |
8JD252Upgrade OS on Porter (contact= Erinn) |
9JD253Site Visit (JB, NT): Details swapped 15 flasks at west robot downloaded from uc, ucb, cnr, prof, met, nctc, soil, tcs re-deployed the ATI 2-D sonic anemometer span @ 1690 psi, N2 @ 1800 psi hauled an old span cylinder and an old N2 cylinder back to the trailer, hauled a new span cylinder out to the tower |
10JD254 |
11JD255SpB in Utah |
12JD256SpB in Utah |
13JD257 |
14JD258 |
15JD259 |
16JD260Site Visit (JB, SpB, NT): Details , Photos (23) hauled last N2 cylinder from the trailer out to the tower from XX:XX-XX:XX MST, Changed profiler (li-6251) dessicant tested out calibration of LI-7500 (using LI-610) re-made TC connected to soil logger (am25t mux, chan_20) swapped 15 flasks at the west robot |
17JD261Site Visit (SO): Details Steve Oncley made some small adjustments to the alignment of the mini-tower (this might have been done a week earlier). |
18JD262 |
19JD263 |
20JD264 |
21JD265 |
22JD266Autumnal equinox |
23JD267Site Visit (JB, SpB, NT): Details , Photos (24) from 10:10-11:50 MST, Replaced tubing, heat exchanger and Nu-Pro filters in the LI-6262 flux system Tested a new snow temperature probe to the cr10 logger (note the wiring needed re-doing) swapped 15 flasks at the west robot Clear and cool (classic fall day). The Aspens around the site are at near peak color. |
24JD268 |
25JD269 |
26JD270 |
27JD271Chan 204 (MET logger) losing 1-hz data (SC932 seems to be up and down) |
28JD272Chan 204 (MET logger) losing 1-hz data (up and down) |
29JD273Chan 204 (MET logger) losing 1-hz data (up and down) |
30JD274Site Visit (JB, NT, SpB): Details , Photos (28) span @ 1450, N2 @ 1200 swapped 15 flasks at west robot added 2 accelerometers to the "fast" logger started running ops47 (added 2 accelerometers) started digging holes for the CS616 probes |
1JD275Site Visit (JB, NT, SpB): Details , Photos (12) tested the replacement laptop at the tower tested some CS616 probes with the soil logger (see details) |
2JD276 |
3JD277Site Visit (JB, SpB, MP, NT, DB, Diego, SO): Details , Photos (11) JB, SpB and MP finished removing the PAR wands from grove 1 and started work on grove 2, hauled the adam and some other par equipment back to the trailer SpB troubleshot the CS616s some more... |
4JD278 |