Previous | Calendar |
October |
2008 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
28JD272 |
29JD273 |
30JD274Site Visit (JB, NT, SpB): Details , Photos (28) span @ 1450, N2 @ 1200 swapped 15 flasks at west robot added 2 accelerometers to the "fast" logger started running ops47 (added 2 accelerometers) started digging holes for the CS616 probes |
1JD275Site Visit (JB, NT, SpB): Details , Photos (12) tested the replacement laptop at the tower tested some CS616 probes with the soil logger (see details) |
2JD276 |
3JD277Site Visit (JB, SpB, MP, NT, DB, DR-I, SO): Details , Photos (11) JB, SpB and MP finished removing the PAR wands from grove 1 and started work on grove 2, hauled the adam and some other par equipment back to the trailer SpB troubleshot the CS616s some more... |
4JD278 |
5JD279 |
6JD280 |
7JD281Site Visit (JB, NT, SpB, MP, AW, LL): Details , Photos (22) swapped 15 flasks at the west robot finished par wand removal at grove 2 SpB got five of the CS616s working and calibrating in some soil near the soil logger |
8JD282Swap Teal Jeep for Gray Jeep |
9JD283Site Visit (JB, NT, SpB, MP, AW): Details , Photos (28) finished par wand removal at grove 3 connected all 8 new CS-616s to soil logger 416 mux, started IC (see notes for details) from 12:15-12:30 MST, removed 5.6m csat (sn 0328) from mini-tower Sunny and clear at the site (upslope winds). Socked in with clouds down on the plains. |
10JD284mailed 5.6m csat (s/n 0328) for re-cal and rain upgrade at 20:00 MST, N2 calibrations with LI-6262 (6251 too?) system started having problems. |
11JD285First Significant snow of the season (approx 3-4"). |
12JD286at times on the edge of colder air from the lowlands (approx 9AM MST). |
13JD287 |
14JD288Site Visit (JB, NT): Details brought up 1 new N2 cylinder (CC199722) and 1 new span cylinder (CC282360) to the trailer from Ramaley swapped 15 flasks at the west robot then changed it to "winter mode" (i.e. 4 flasks every two weeks) downloaded from soil, UC, UCB, nctc and prof fired up the mrs logger and Noah's logger, sent mrs_03b.dld to the mrs logger span @ 1250 psi, N2 @ 700 psi see "details" about the solenoid valves in the LI-6262 box from ~1:55-1:58 MDT did a manual N2 calibration of the EC system to test the N2 flow rate |
15JD289AmeriFlux Meeting (in Boulder). |
16JD290AmeriFlux Meeting. Site Visit (JB, SpB): Details brought up the last two cylinders from Ramaley, both span, CC153480 and CC245057 N2 (CC125575) bled almost dry since Tuesday! a leak somewhere in the system...retired this cylinder started new N2 cylinder CC262287 at 1850 psi span @ 1250 psi swapped the mag. perch. and indicator tube at the LI-6251 disconnected the N2 zero cal at the LI-6262, left everything else as-is (to try and isolate any leak). |
17JD291ordered three tanks of N2 from Airgas AmeriFlux Meeting. Gray Jeep back to motor pool |
18JD292 |
19JD293Site Visit (JB, SpB, MP, NT, SL, Flurry, Harley): Details , Photos (22) Installed the new soil moisture sensors (cs-616s) and re-deployed some of the cs-615 sensors in new locations so that each one is co-located with a snow depth sensor (see details) N2 cylinder was at approx 1830 psi (so leak is most likely in the N2 zero cal of the LI-6262). made an amp connector extension with 75 ft. of cable for one of the new snow temp sensors, but the sensor didn't seem to work...maybe not the same one we tested at the mrs logger? |
20JD294 |
21JD295 |
22JD296 |
23JD297 |
24JD298Site Visit (JB, SpB): Details , Photos (20) at 11:40 MDT, started ops48 (added extra co2 param and removed one accelerometer) N2 @ 1700, span @ 1100 got a snow temp probe working with mrs_03c.dld (see details for wiring) |
25JD299 |
26JD300 |
27JD301 |
28JD302Site Visit (JB, SpB, MP, NT): Details N2 @ 1610, span @ 1150 cleaned the krypton see details for additional notes swapped 4 flasks at west robot |
29JD303 |
30JD304Site Visit (JB, MP, NT): Details did all of Maggie's new growth collections helped winterize NT's plots checked on the two tanks running at the tower, both okay brought up a new N2 tank from Ramaley, cc264964 |
31JD305Site Visit (JB, SpB): Details , Photos (32) brought up a new N2 tank from Ramaley, cc264970 from 10:30-11:15 MST, removed csat 0438 (ver3) at 21.5m, added csat 0328 at 21.5m (w/ ver4, "rain" upgrade) at 14:30 MST, added csat 0438 at 5.7m at 14:30 MST, started ops49 (added a TC at 30cm AGL to UCB logger) at 14:30 MST, started running "ucb_10.csi" on UCB logger Halloween |
1JD306 |