Previous | Calendar |
April |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
27JD86 |
28JD87SpB Off |
29JD88 |
30JD89 |
31JD90Snow Pit (MM/DG) |
1JD91Site Visit (SpB): Details , Photos (34) Compact Rental east robot: done=0 At ~15:00 MST, New Connections at Hydra: 4G to A1, 5G to A4, 5C to B2, 3G to B6, (6C is now disconnected) |
2JD92 (Warm)Change to daylight savings time (MDT). |
3JD93 (Warm/Sunny) |
4JD94 |
5JD95 |
6JD96Robots Start ACME Meeting at Keystone. |
7JD97ACME Meeting at Keystone. Snow Pit (MM/DG) |
8JD98ACME Meeting at Keystone. |
9JD99 |
10JD100 (Snow!) |
11JD101 |
12JD102 |
13JD103Robots End |
14JD104 ( Sunny/Warm )Site Visit (SpB): Details , Photos (49) Jeep Rental at ~13:00 MST, swapped ozone target east and west robots; done=1 Snow Pit (MM/DG) |
15JD105 |
16JD106 |
17JD107 |
18JD108 |
19JD109 |
20JD110 |
21JD111 (Blustery)Site Visit (SpB, JH, MW, KR): Details , Photos (30) Prius Rental from 11:30-11:42 MST, Changed profiler (li-6251) dessicant at 11:37 MST, zeroed li-6262 Collected soil at Hydra inlets (MW) East/West Robot flasks swapped (KR/SpB). Snow Pit (MM/DG) |
22JD112 |
23JD113 (Snow) |
24JD114 (Snow)A couple of short (10-300 second) power micro-outages. |
25JD115Many short power glitches. |
26JD116Collected soil at Hydra inlets (MW) More short power glitches. at 15:30:11 MDT, looks like hydra went "out to lunch" for a while this afternoon? from around noon-3 mdt |
27JD117at 12:03 and 13:02 MDT, short power glitches. at 15:00 MDT, noticed the hydra was not working, so restarted the data system to reset hydra. |
28JD118 (Snow)at 10:10 MDT, 5 second power glitch. |
29JD119Site Visit (SpB, JH, KR): Details , Photos (42) Jeep Rental at Hydra, B7 and B9 slightly plugged Uploaded new East/West Robot Logger Program (AUTO24NW.*), reset robots (KR/SpB). Snow Pit (SpB/KR) |
30JD120at ~8:30am MST, li6262 starts having problems. |