Previous | Calendar |
March |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
27JD58 |
28JD59 |
1JD60 |
2JD61 |
3JD62(Clear/Sunny)Site Visit (SpB, JH): Details , Photos (36) Jeep Rental Hydra, at 12:25 MST: swapped A1/A4 (now A1=4G, A4=5C), A1,B2,B5 still appear to have flow problems. |
4JD63 |
5JD64 |
6JD65 |
7JD66 |
8JD67 |
9JD68(Weak Chinook)Site Visit (SpB, JH): Details , Photos (28) Hydra, between 10:30-11:00 MST: disconnected A1/A4/B2/B5 and attached air inlets directly at hydra box. Robots Start |
10JD69Snow Pit (MM) |
11JD70 (Windy)Site Visit (SpB): Details , Photos (19) Jeep Rental at ~14:30 MST, Moved line 6G from hydra inlet A6 to B5 |
12JD71Snow/Photochemistry IOP (START) |
13JD72 (Snow) |
14JD73 (More Snow)Site Visit (SpB, DH, JH): Details , Photos (24) Jeep Rental |
15JD74 |
16JD75Site Visit (SpB, ZC): Details , Photos (24) Hydra, did diffusion tests (12:00-15:00 MST) Robots End |
17JD76Site Visit (SpB, ZC): Details , Photos (29) Jeep Rental from 12:38-15:06 MST: Replaced tower N2 at ~12:55 MST: Changed Ozone target at Hydra: from 11:00-18:06 MST the main pump was stopped for diffusion tests (14:45-17:30 MST) Snow Pit (MM/DG) |
18JD77 |
19JD78Site Visit (ZC, BL): Details at Hydra: Zoe/Barry were doing snow diffusion tests (10:00-11:30 MST) |
20JD79Spring Equinox Snow/Photochemistry IOP (END) |
21JD80 |
22JD81SpB Off |
23JD82Site Visit (SpB): Details , Photos (33) from 10:50-11:02 MST: changed profiler dessicant at 11:30 MST: swiped Krypton Hygrometer reset east/west robots; changed dessicant/soda lime tubes at west robot at Hydra: |
24JD83SpB Off |
25JD84CU Spring Break SpB Off |
26JD85 |
27JD86 |
28JD87SpB Off |
29JD88 |
30JD89 |
31JD90Snow Pit (MM/DG) |
1JD91Site Visit (SpB): Details , Photos (34) Compact Rental east robot: done=0 at ~15:00 MST, New Connections at Hydra: 4G to A1, 5G to A4, 5C to B2, 3G to B6, (6C is now disconnected) |
2JD92(Warm)Change to daylight savings time (MDT). |