Previous

Calendar

November

2003

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD299
--data system shutdown at ~4am--- (restarted at about 9am)

27

JD300

28

JD301
--data system shutdown at 23:38 MST--- (restarted on 9/29 @ 8:30am)

29

JD302
Site Visit (SpB, AT): Details , Photos (7)
Robot Loggers Reset.
Note: Overland Fire Burning in LeftHand Canyon.
Additional TCs added to soil logger..new program started: soilsnow.csi

TC logger program changed to: Tc23x03.csi (removed muxII/III, added IRT (IRT not working))

30

JD303
Brief data system shutdown at 13:00 MST--- (due to a short power outage, restarted at 13:10 MST)

31

JD304

1

JD305
Site Visit (SpB): Details , Photos (55)
* Network to russter down

2

JD306

3

JD307
* Network to russter back up (~10am)

4

JD308
Site Visit (SpB, RM, LSD, BB): Details , Photos (5)

5

JD309

6

JD310

7

JD311
Site Visit (SpB): Details
Robot Loggers Reset (SpB)

8

JD312

9

JD313

10

JD314

11

JD315
Site Visit (AT): Details

12

JD316
Site Visit (SpB): Details

13

JD317
Site Visit (SpB): Details , Photos (18)
Swapped East/West Robot Flasks...reset robots to 28-day cycle (SpB)

14

JD318
* quacker down at ~10pm MST

15

JD319
* quacker down

16

JD320
* quacker down

17

JD321
Site Visit (SpB, BB): Details
* quacker back up at ~9:00 MST.
* data system down from about 14:00-22:00 MST (patch).
Snow Pit (SpB,BB,AO)

18

JD322

19

JD323
Site Visit (SpB, LSD, BB): Details , Photos (10)

20

JD324

21

JD325
Site Visit (SpB, BB): Details
Replaced Deep-cycle Battery at N Canopy Tower (SpB/BB)

22

JD326
* quacker down

23

JD327
Site Visit (SpB): Details
* quacker back up at ~13:30 MST.

24

JD328
SpB Vacation (start)

25

JD329

26

JD330

27

JD331
TURKEY DAY

28

JD332

29

JD333

30

JD334

1

JD335

2

JD336
* Hydra stopped

3

JD337
SpB Vacation (ends)

4

JD338
Site Visit (SpB): Details

5

JD339
Site Visit (SpB,BB,RM): Details
Snow Pit (SpB,BB,AO)
* Hydra restarted

6

JD340