Previous

Calendar

October

2003

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

28

JD271

29

JD272

30

JD273
Site Visit (SpB, BB): Details , Photos (17)

1

JD274

2

JD275
Site Visit (SpB): Details , Photos (15)
West Robot Flasks Swapped
Removed MUXII from TC cr23x logger (didn't change csi program)

3

JD276
Site Visit (SpB,BB): Details
~11AM, TGA Dewar Filled (SpB)

4

JD277

5

JD278

6

JD279

7

JD280
Site Visit (SpB,AT,RM,AS, JS,DL,TD,KK,NP): Details
~9:30AM, TGA Dewar Filled (SpB)
Replaced East Robot (Andy S.)
Started moving soil sensor (disconnected soil logger) (AT)

8

JD281

9

JD282
Site Visit (SpB,AT,RM,CXY): Details
~11AM, TGA Dewar Filled (SpB)
West Robot Flasks Swapped
Moved soil sensors (heat flux plates, temp, moisture sensors), restarted soil logger (using same program)

10

JD283

11

JD284

12

JD285

13

JD286
Site Visit (SpB,BB): Details
~10AM, TGA Dewar Filled (BB)
Ameriflux Meeting

14

JD287
Ameriflux Meeting

15

JD288
Ameriflux Meeting

16

JD289
Site Visit (AT,DB): Details
Ameriflux Meeting
Laser Teardown

17

JD290
Site Visit (SpB,AT,RM,DB,BB, CXY,LSD,DL,JH,S): Details
Laser Teardown
Hydra Installed
East/West Robots both had done==2 (not changed), checked by Dave Bowling

18

JD291

19

JD292

20

JD293

21

JD294
Site Visit (SpB): Details
At 13:15 MST refurbished LiCor 6262 up and running.

22

JD295
Site Visit (SpB, AT, RM): Details
--data system shutdown at ~4am--- (restarted at about 11am)

23

JD296
Site Visit (SpB): Details
Robot Loggers Reset.

24

JD297

25

JD298
Site Visit (SpB): Details

26

JD299
--data system shutdown at ~4am--- (restarted at about 9am)

27

JD300

28

JD301
--data system shutdown at 23:38 MST--- (restarted on 9/29 @ 8:30am)

29

JD302
Site Visit (SpB, AT): Details , Photos (7)
Robot Loggers Reset.
Note: Overland Fire Burning in LeftHand Canyon.
Additional TCs added to soil logger..new program started: soilsnow.csi

TC logger program changed to: Tc23x03.csi (removed muxII/III, added IRT (IRT not working))

30

JD303
Brief data system shutdown at 13:00 MST--- (due to a short power outage, restarted at 13:10 MST)

31

JD304

1

JD305
Site Visit (SpB): Details , Photos (55)