Previous | Calendar |
August |
2002 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
28JD209 |
29JD210 |
30JD211 |
31JD212Site Visit (AT): Details between 7/31 and 8/2 replaced the duck system with the quacker in the evenings would switch back to the duck system, in afternoons would be working on quacker (lots of lost data) |
1JD213Site Visit (AT): Details |
2JD214Site Visit (AT): Details left with quacker running channels 200, 201, 203, and 205 only |
3JD215 |
4JD216 |
5JD217Site Visit (AT, BL): Details connected all channels (200-206) to the quacker Brian Lamb Team from WSU arrives |
6JD218Site Visit (AT, BL, SpB, JS): Details transport NCAR/TC 23x and thermocouples to the site Big Rainstorm. |
7JD219Site Visit (AT): Details took GPS readings |
8JD220Site Visit (AT): Details Profiler (li-6251) dessicant changed |
9JD221 |
10JD222 |
11JD223 |
12JD224 |
13JD225Site Visit (AT, JS, SpB, BS, +): Details , Photos (23) Images of Balloon, Instruments on CU Tower |
14JD226 |
15JD227 |
16JD228 |
17JD229 |
18JD230 |
19JD231at NCAR FL (TD, SpB): Details , Photos (14) Photos of Hydra in NCAR FLAB |
20JD232Site Visit (TD, GM, KK, SpB, JS): Details , Photos (12) connected NCAR/TC23x to the quacker (ch 207). [should start a new OPS file, the NCAR TCs first show up in ops3]. ncartc is only running at approx 0.9 hz HYDRA setup/deployment. |
21JD233A note on the channel configuration at this time: 200= ATI sonic 201= FAST (cr23x) 202= met (cr23x) 203= prof (cr23x) 204= UC logger (cr23x), 2m csat + handar 205= cnr logger (cr23x) 206= UC logger2 (cr21x), 4m csat + UC LI-7500 207= nctc logger (cr23x) |
22JD234 |
23JD235 |
24JD236 |
25JD237 |
26JD238Site Visit (AT): Details Some channels are dropping data, tried to power cycle logger to fix turned off ncar tc to try and fix the problem (didn't help) |
27JD239Site Visit (AT): Details ati sonic data seems ok when sent directly to laptop at around 3pm, reconnected ncartc moved LI-7500 from near ATI k-probe to close to CSAT-3 (i think at 21.5m) |
28JD240Site Visit (AT, BB): Details Profiler (li-6251) dessicant changed (possible leak in dessicant tube?) NOTE: AT swapped some of the channels to try and fix the data dropout problem |
29JD241 |
30JD242 |
31JD243 |