Previous

Calendar

July

2002

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

30

JD181

1

JD182

2

JD183

3

JD184

4

JD185
Independence Day

5

JD186
Site Visit (AT, BB): Details

quacker died at 5:30am

changed FAST logger code, krypton modified

also changed MET logger code

moved LI-7500 close to CSAT-3 (not sure if this is at 21.5m or in-canopy?)

6

JD187
data system down

7

JD188
Site Visit (AT): Details

data system down

reset MET/PROF loggers to MDT, also uploaded new versions of met/prof programs

changed prof sampling strategy (now spends 60 sec on each level)

start of ops3 (added "nox" to fast logger, changed order of met logger data output, also start including NCAR TC data, even though not installed till 8/20!)

8

JD189
Site Visit (AT): Details

replaced duck hard drive

data system back up at approx 13:00 MST

now running, "Fast23x7.CSI" in fast logger

9

JD190

10

JD191

11

JD192
Site Visit (AT, BB): Details

Changed profiler (li-6251) dessicant and filters

swiped krypton hygrometer

changed LI-6262 nupro inlet filter

now running, "met30D.CSI" in met logger

re-loaded "21sonic.CSI" in UC logger (power went out so it lost the program)

moved LI-7500 back to near ATI sonic (i think at 21.5m)

at 15:00 MDT, shutdown/restarted duck system to replace UPS

12

JD193
rebooted duck system

13

JD194

14

JD195

15

JD196

16

JD197
rebooted duck system

17

JD198

18

JD199
Site Visit (AT): Details

New Span Gas (ASG tank #2)

19

JD200

20

JD201

21

JD202

22

JD203

23

JD204

24

JD205

25

JD206

26

JD207

27

JD208

28

JD209

29

JD210
Site Visit (JS, SO, +): Details , Photos (8)

30

JD211

31

JD212
Site Visit (AT): Details

between 7/31 and 8/2 replaced the duck system with the quacker

in the evenings would switch back to the duck system, in afternoons would be working on quacker (lots of lost data)

1

JD213
Site Visit (AT): Details

2

JD214
Site Visit (AT): Details

left with quacker running channels 200, 201, and 203 only

3

JD215