Previous | Calendar |
November |
1999 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
31JD304Halloween |
1JD305 |
2JD306Site Visit (AT): Details at 14:45, new N2 cylinder from 12:30-13:30, re-plumbed the EC/LI-6262 system at 14:30, manual cal of the EC/LI-6262 system at 15:30, download of 23xA logger data swiped/cleaned krypton hygrometer changed filter on TECO o3 inlet |
3JD307 |
4JD308 |
5JD309 |
6JD310 |
7JD311 |
8JD312Site Visit (AT): Details from 11:20-12:05, EC system down, put up new inlet line (new filters) added heater to EC system |
9JD313 |
10JD314 |
11JD315Site Visit (AT): Details a few more adjustments to the EC/LI-6262 system (see AT logbook notes) |
12JD316 |
13JD317 |
14JD318 |
15JD319 |
16JD320Site Visit (AT): Details at 10:30, hooked back up the rain/snow gauge at 11:15, new CO2 span gas |
17JD321 |
18JD322 |
19JD323 |
20JD324 |
21JD325 |
22JD326 |
23JD327 |
24JD328 |
25JD329TURKEY DAY |
26JD330 |
27JD331 |
28JD332 |
29JD333 |
30JD334Site Visit (AT): Details N2/zero gas is empty (found/fixed some small leaks) at 13:15, CO2 span gas opened (note, NO SPANs since 11/16, valve accidentally left closed!) turned off fan in EC/LI-6262 box manual zero/span of EC/LI-6262 system collected soil data for Nov |
1JD335 |
2JD336NOTE: autocals still not working! |
3JD337 |
4JD338 |