Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD269 |
27JD270 |
28JD271 |
29JD272 |
30JD273 |
1JD274 |
2JD275 |
3JD276 |
4JD277Site Visit (AT): Details 13:30, EC/LI-6262 system off; manual cal of EC system |
5JD278Site Visit (AT): Details Changed filters on profiler inlets 5+6 moved rain gauge to south side of tower (and hooked up heater) from 14:40-15:01, changed domes on REBs Q*7.1 |
6JD279 |
7JD280 |
8JD281 |
9JD282 |
10JD283 |
11JD284Site Visit (AT): Details at 16:45, new CO2 standard/span tank from 10:30-17:00, EC/LI-6262 system makeover --> replaced flow meter w/ flow controller --> switched the 3-way sample/calibrate valve Columbus Day |
12JD285 |
13JD286Site Visit (AT): Details from 9:50-10:15, fixed autocals; manual cal of EC/LI-6262 system is rain gauge heater working? |
14JD287 |
15JD288 |
16JD289 |
17JD290 |
18JD291 |
19JD292Site Visit (AT): Details from 14:15-14:30, swapped N2/zero gas cylinder |
20JD293 |
21JD294 |
22JD295Site visit (AT): Details 3:45 PM, re-zeroed and spanned the EC CO2 system, turned flow up to 500 sLpm |
23JD296 |
24JD297 |
25JD298 |
26JD299 |
27JD300 |
28JD301Examing the EC system (see ideas drawn in AT logbook) |
29JD302 |
30JD303 |