Previous | Calendar |
September |
2018 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD238 |
27JD239 |
28JD240 |
29JD241 |
30JD242 |
31JD243 |
1JD244 |
2JD245 |
3JD246SpB Returns |
4JD247 |
5JD248 |
6JD249 |
7JD250 |
8JD251 |
9JD252 |
10JD253 |
11JD254road above C-1 closed for repairs |
12JD255NWT/LTER Meeting (2:30 - 4pm, SEEC, S228) road above C-1 closed for repairs |
13JD256Site Visit (SpB, DA, +): Details , Photos (48) Span cylinder at 600 psi (valve closed). N2 at 350 psi (valve closed) from 8:30-9:25 MST, eletricity to tower cut; power lines to USGS tower removed from 12:15-12:30 MST, swapped inlet assembly for LI-7200 (now using heated one) from 13:00-13:30 MST, removed LI-6262 (gast pump turned off) checked tower guy wire tensions (see notes) SpB Prius Clear skies, warm |
14JD257 |
15JD258 |
16JD259 |
17JD260 |
18JD261 |
19JD262 |
20JD263In Lab/Cristol (SpB): Details booted the spare PC-104/titan as "titan2", tested the new usb cable, added spare ext3 thumb drive now ingesting data from titan2 as "niwot_dreamplug" (started ops91) data loggers used: cr23x_sn2262 (lab_01.csi) and cr10x_snX14042 (ncar_1f.csi) Photos from Lab/Cristol: Titan (usb cable) , Titan , Data loggers |
21JD264 |
22JD265Fall Equinox |
23JD266 |
24JD267 |
25JD268 |
26JD269 |
27JD270Site Visit (SpB, MR, DA): Details , Photos (27) Span cylinder (valve closed). N2 at 350 (valve closed) moved 6 N2 gas cylinders from MRS to C-1 trailer: moved 2 co2 span gas cylinders from MRS to C-1 trailer: moved 1 empty N2 cylinder from C-1 to MRS: cc443821 Installed new subcanopy radiation (apogee) sensors with MR (started ops92 and ucb_19.csi) DA was removing the USGS "north" tower Enterprise SUV Warm, some wind and clouds |
28JD271 |
29JD272 |
30JD273 |
1JD274 |
2JD275 |
3JD276Site Visit (SpB, DA+): Details , Photos (26) Span cylinder at 550 psi, N2 at 250 psi from 11:00-12:30 MST, re-installed the re-calibrated LI-6262 Changed the fast logger program so all data are output with "High Resolution" (fast_26.csi) Changed the ucb logger program (ucb_20.csi, minor change to thermistor excitation voltage) Started ops93 (but no change to niwot.xml) found a few more "NW B" trees (see photos) DA was cleaning up the power cable SpB Prius Variable, warm with some wind gusts |
4JD277from approx 13:00-14:00 MST, short power/network outage at the site (everything appears to have come back ok) |
5JD278 |
6JD279 |