Site Visit (SpB): Details , Photos (24)

Span cylinder at 970 psi. N2 at 1170 psi

from 12:00-12:40 MST, moved a connection box for the REBS Q-7.1 sensor closer to the CNR enclosure/box

from 12:40-13:00 MST, replaced domes on REBS Q-7.1 Rnet sensor

from 14:30-15:00 MST, swapped the inlet assembly for the LI-7200 (flow was at zero)

the connection to the FLIR camera has been suspect--tried to figure out the issue (bring monitor cable!!)

SpB Jeep

High clouds; calm; warm

3

JD215

4

JD216

5

JD217

6

JD218
In Lab/Cristol (SpB): Details , Photos (4)

cleaned Nupro filters (three 2-micron ones, plus two that go in the LI-7200 inlet filters)

booted the spare PC-104/titan as titan2 (need usb dongle and thumb drive)

tested one of the USGS krypton hygrometers (sn 1104)

7

JD219
Site Visit (SpB): Details , Photos (18)

Span cylinder at 900 psi. N2 at 1000 psi

moved six gas cylinders from C-1 to MRS snowshed: cc453607, cc488560, cc443821, cc448922, cc153444 (span), cc175573 (span)

from 12:00-13:00 MST, removed krypton hygrometer (sn 1249) and replace with krypton (sn 1104)

at around 13:00 MST, started using fast_25.csi (increased mV range for h2o.ec)

started ops90: from 15:00-15:30 MST, moved par.kz1_old (downward-looking) and par.kz2_new (upward-looking) higher up and connected to prof logger (started prf_03.csi)

further investigated issues with the FLIR camera: appears to be the camera itself or network cable to camera

Enterprise SUV

Calm and warm

8

JD220

9

JD221

10

JD222
Site Visit (MR): Details

Mark R was at the site

11

JD223

12

JD224
at 23:00 MST, auto-reboot of urquell

13

JD225

14

JD226
at approx 14:00 MST, network via radio modem to tower is down (fiber still ok)

15

JD227

16

JD228

17

JD229
Site Visit (SpB): Details , Photos (4)

Span cylinder at xxx psi. N2 at xxx psi

at approx 15:30 MST, network via radio modem to tower is back up (needed power-cycling, see notes)

phenocam images taken since 8/14 network outage are lost

18

JD230

19

JD231

20

JD232

21

JD233

22

JD234
Site Visit (SpB, JL): Details , Photos (12)

Span cylinder at 750 psi. N2 at 750 psi

from 13:35-13:45 MST, adjusted cal gas flow in LI-6262

at 14:15 MST, rebooted the LI-7200 to reset/sync the time with GPS

after investigating, JL removed the FLIR camera from the tower

SpB Prius

Big clouds, cool

23

JD235

24

JD236
SpB Off

25

JD237

26

JD238

27

JD239

28

JD240

29

JD241

30

JD242

31

JD243

1

JD244
SpB returns