- 85: robots, Site robots, Tue 22-Jul-2003 12:26:00 MDT, Closed valves -- Monday July 21.
Monday July 21.
The robots had *6A, done=1.
Brant closed/checked the East Tower and closed stopcocks. SpB
did the west.
- 81: robots, Site robots, Thu 17-Jul-2003 16:39:17 MDT, Flasks Swapped on July 17th (Thursday).
Thursday, July 17th.
I showed Brant how to swap the flasks at the West Tower. I
finished the West Tower flasks and he did the ones at the East Tower
on his own.
Forgot to copy the cr23x robot data files off of the laptop---will
do this tomorrow. The GPS crew is supposed to bring down the suitcase
with the swapped flasks. Will mail these tomorrow.
also, I should compile the cr23x logger code on the laptop (the program
is on a floppy disk in my backpack).
- 74: robots, Site robots, Thu 10-Jul-2003 16:51:19 MDT, Swapped Flasks, July 10th
July 10th, 2003.
Swapped the flasks. NO problems (that I know of).
Data files are on the web at:
http://urquell.colorado.edu/bowling/data_robots/
The 2 files are:
-rw-rw-r-- 1 sburns 19477 Jul 10 12:43 030710E.dat
-rw-rw-r-- 1 sburns 18957 Jul 10 10:01 030710W.dat
*E is the East Robot Tower
*W is the West Robot Tower.
Update, July 11th:
*These were FedEX'ed to Utah on July 11th.