Here is a list of items which Andy and I talked about:
Immediate Needs:
-----------------
At the tower :
Most Important :
(1) Download tower data loggers (Bill may have done this)
(2) Try loopback test on the quacker
(3) Check out the Kr hygrometer - is it hooked up properly. (at ~24m)
(4) Switch PC-card in the MRStemp logger. Try to download data from old card.
Secondary Importance:
---------------------
(1) Calibrate the other CO2 standard at the trailer. [still have 2-3 months
since the tank at the tower was full from last visit].
(2) Change filters on the profile system
(3) Change filters on the Li6262 EC system.
For Double Profiler :
(1) Buy new pump (big pump to continously pump the lines - check with tony and see what he ordered last summer). Gast Model #RAA-V210-EB (T-seed)
(2) Replumb the inlet lines at the shack.
a) Put in bulkhead inlet with 3/8" bulkhead fittings
b) make lines from bulkheads to glass volumes out of Dekabon.
c) makes lines from glass volumes to solenoid manifolds out of Dekabon
(3) Need to order : 3/8" bulkhead fittings (14 or more) + some extra 3/8" ferrules and nuts. [SpB, order from Denver valve]
(4) will probably need to change the inlet filters in the spring.
Stuff to order:
---------------
(1) new HMP45D Rel.Hum/Temp. sensor - need to ask : am replacing an HMP35D - will new one fit in the same housing??? [SpB.]
(2) Gast pump for EC system. Model 1531.
Can ask about repairing our old one - has a broken insert plate (part # AG293)
(also buy a "Service Kit" - only about $25.00)
[according to Dean this is not worth reparing].
(3) Get ATI sonic fixed. Make some plots of v-axis (vs. CSAT-3) from last summer to show them. [T-seed]
(4) Send back propvane upstairs - had problem of suddenly not outputting analog signals, although it had power and good cables. Could have been grounding problem. Also, needed recalibration. [T-seed]
(5) Send back Li7500 to have chopper blades painted. [T-seed]
Computer Stuff:
--------------
(1) Buy new hard drive for urquell (backup drive)
[we decided that a 80Gb Drive for specialk might be a better thing to do].
Processing stuff:
----------------
(1) make ASCI outputs from Splus functions (in batchcode) so Sean can use in MatLab.
(2) get Matlab for the workstations. [working on this...]
(3) get Linux and put it on Sean's PC. [SpB.]
Stuff for Sean to know how to do:
--------------------------------
(1) Get Sean to run batch codes
(2) get Sean to run weekly/monthly code.
(3) put in soil data - from loggers to S+
(4) put in logger backup data. [uses excel on PC].
(5) show him some Campbell logger code - how to do it.
--to run here we need to bring the translator box back from the trailer
--one idea: change some of the code on quacker ch201 from "L" to "H"
resolution...also, update quacker:200 to use "campbell_binary".
--some additional S-plus programs to try: "co2.fluxes2.q" and "sonic.tests.q"