Previous

Calendar

May

2025

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

27

JD117

28

JD118

29

JD119

30

JD120

1

JD121

2

JD122

3

JD123

4

JD124

5

JD125

6

JD126
Rain, sleet, snow (a very wet day)

7

JD127
Snow

8

JD128

9

JD129

10

JD130

11

JD131
Mothers Day

12

JD132
at 7 MST, network to tower was not working well; rebooted network switch at tower (then seemed ok)

AMS Ag Forest Met Meeting (Denver), Start

13

JD133

14

JD134

15

JD135

16

JD136
AMS Ag Forest Met Meeting (Denver), End

17

JD137

18

JD138

19

JD139

20

JD140
Site Visit (SpB): Details , Photos (32)

Span cylinder at 100 psi, N2 at 350 psi

did not disturb the pluvios

the flow rate in 21.5m LI-7200 inlet was low (need to check data!)

at 10:00 MST, turned on sap flow logger for Aylin

The road from MRS to C-1 was driveable (first time this year it's been open)

Downloaded AP200, sap flow data, and teros11 tree water content logger data

SpB Jeep

Windy, cool, and sunny

21

JD141

22

JD142

23

JD143

24

JD144

25

JD145

26

JD146
Memorial Day

27

JD147
Visit planned by AB/SM (Start)

28

JD148
Visit planned by AB/SM

wet/rainy

29

JD149
Site Visit (SpB, HR, MR, AB, SM): Details , Photos (26)

Span cylinder at 100 psi, N2 at 200 ---> 1900 psi

swapped N2; removed cc702386 at 100 psi, now using eb0033789 at 1900 psi

did not disturb the pluvios

from 10:10-10:20 MST swapped the 21.5m LI-7200 inlet (added the heated inlet)

at 13:05 MST, downloaded RADCAM photos

met Aylin/Sandra to talk about soil sensor installation

Enterprise SUV (by HR)

In-cloud, cool, wet

30

JD150
Pre-dawn visit planned by AB/SM (End)

31

JD151