Previous

Calendar

September

2023

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

27

JD239

28

JD240

29

JD241
In Lab/Cristol (SpB): Details , Photos (4)

cleaned Nupro filters (for LI-6262 and LI-7200 inlets)

formatted usb disk on urquell2?

30

JD242

31

JD243
(Full "Blue" Moon)

1

JD244
Site Visit (SpB, WM, JF, GV, SO, C, W, +): Details , Photos (37)

Span cylinder at 1350 psi, N2 at 1300 psi

at 10:30 MST, tried to download PolaRx5 GPS "A" (sn 3062189) data files; only 4 days of data! (battery issue?)

at 11:04 MST, downloaded PolaRx5 GPS "B" (sn 3227662) data files (in forest)

at 11:05 MST, swapped SD card from GPSCAM

at 11:05 MST, the forest PolaRx5 GPS "B" antenna was level

from 12:15-12:30 MST, removed the (broken) 21.5 LI-7500A

WB, JF, and GV collected Novick soil samples (3 depths; 4 locations)

started sampling with the AP200 (3 inlets connected)

Enterprise SUV rental

Calm and clear in AM; partly-cloudy in PM

2

JD245

3

JD246
at approx 11:30 MST, lost contact with the US-NR1 tower

at mid-day, snow/hail at tower; lightning strike near C-1

4

JD247
CU Holiday (Labor Day)

connection to the US-NR1 tower down all day

5

JD248
In Lab/Cristol (SpB): Details , Photos (8)

prep'ed weighed box with Novick soil samples

formatted 5Tb one touch seagate usb disk on urquell2

Connection to the US-NR1 tower still down

6

JD249
Jane S. team setup dust samplers on the tower.

Connection to the US-NR1 tower still down

7

JD250
Site Visit (SpB): Details , Photos (35)

Span cylinder at 1300 psi, N2 at 1200 psi

the PolaRx5 GPS "A" (sn 3062189) did not work; removed power supply, went back to powering with the rad/cnr logger

at 11:15 MST, downloaded PolaRx5 GPS "B" (sn 3227662) data files (in forest)

at 11:15 MST, the forest PolaRx5 GPS "B" antenna was level

at around 12 MST, OIT replaced the broken network switch at C-1 (tower back on thne network)

downloaded the AP200 data

modifed the AM25T setup in the trailer at C-1 (am25t_05.csi)

Enterprise rental

Clear, cool, and breezy

8

JD251
Jane S. team removed dust samplers from the tower.

9

JD252

10

JD253

11

JD254
SpB Off

12

JD255

13

JD256

14

JD257

15

JD258
at around 16:00 MST, the FAST cr23x logger data stops being ingested by isffa

21.5m CSAT winds ingested by the LI-7200 go bad (fixes itself on 9/23)

16

JD259
at around 7:30 MST, the FAST cr23x logger data is being ingested by isffa (lost approx 14 hrs of data)

17

JD260

18

JD261

19

JD262
Power outage planned for the day (to replace power poles). Note: as far as I can tell, the power at the site never went off.

20

JD263

21

JD264

22

JD265
Fall Equinox

23

JD266
at around 4:00 MST, 21.5m CSAT winds ingested by the LI-7200 are ok again

24

JD267

25

JD268
SpB Returns

26

JD269
site visit by PB with his class.

27

JD270

28

JD271

29

JD272
Site Visit (SpB): Details , Photos (33)

Span cylinder at 1100 psi, N2 at 950 psi

the PolaRx5 GPS "A" (sn 3062189) did not work (again); disconnected power. [remove on next visit].

from 12:04-12:09 MST swapped the 21.5m LI-7200 inlet (removed the heated inlet)

downloaded data from Andrews CR800 and CR1000

downloaded tree sway/accelerometer data

downloaded the AP200 data

at 11:50 MST, changed the AP200 ambient pressure setting from 82 kPa to 72 kPa

inlets for the AP200: 0.5m, 1m (new), 5m (2 inlets there), 7m (new), 10m (new), 14m, 21.5m

Enterprise rental

Warm, Fall is in full swing

(Full "Harvest" Moon)

30

JD273