Previous | Calendar |
May |
2022 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD121 |
2JD122at around 01:00 MST, lost contact with the tower (radio modem dropped connection) at around 08:10 MST, re-established contact with the tower (rebooted the radio modem) in AM, snow |
3JD123 |
4JD124snow |
5JD125 |
6JD126 |
7JD127Site Visit (SpB): Details , Photos (32) Span cylinder at 200 psi, N2 at 1000 psi moved n2 cylinder cc491784 from C-1 to the tower moved empty n2 cylinder cc479490 from the tower to the trailer at C-1 at 11:30 MST, started uc_07.csi (hi-res output from UC logger; no change to OPS) from 12:00-12:25 MST, swapped the 21.5m LI-7200 inlet assembly (removed the heated inlet) rebooted the 2.5m LI-7500A; might now be ok (P at 69 kPa, variables seem reasonable) NOTE: the upper REBS dome has been completely crushed! (see photo; a bird perhaps?) SpB Prius Partly cloudy; some wind; very warm |
8JD128Mothers Day |
9JD129 |
10JD130 |
11JD131 |
12JD132 |
13JD133 |
14JD134 |
15JD135 |
16JD136 |
17JD137 |
18JD138 |
19JD139Windy |
20JD140Snow |
21JD141between 5-9 MST, multiple reboots of the 21.5m LI-7500A (op2) and LI-7200 (likely short power outages) |
22JD142 |
23JD143Snow |
24JD144More Snow picked up two GPS units from UNAVCO |
25JD145tested UNAVCO GPS at home |
26JD146Site Visit (SpB): Details , Photos (42) Span cylinder at 20 ---> 1900 psi, N2 at 700 psi at 14:00 MST, swapped span cylinder; old=cc235665 new=fb03909 (LBL cylinder) deployed UNAVCO GPS at the top of the tower tried to connect to FLIR camera (didn't seem to work?) Enterprise rental Sunny/Warm |
27JD147 |
28JD148Site Visit (SpB, JvB, BsB): Details , Photos (21) Span cylinder at 1900 psi, N2 at 700 psi downloaded UNAVCO GPS data (files very large!) PsT BMW Cool/Overcast |
29JD149 |
30JD150Memorial Day |
31JD151SpB Off in PM, approx 5" of snow phenocam3 image |
1JD152SpB Off in AM, the 21.5m LI-7200 CO2 signal goes off-scale (problem?) |
2JD153SpB Off |
3JD154SpB Off |
4JD155 |